Increase of reliability of electric networks 6(10) kV by means of application of automatic sectionalization points
Authors:
About authors
- Postgraduate student G.V. Plekhanov Saint Petersburg Mining Institute
Abstract
Expediency of sectioning medium-voltage air-insulated distributing mains is justified. Algorithms of re-closers functioning are given to organize decentralized control of emergency operations in distributive networks. Algorithms of decentralized management of the network emergency operations are considered.
Область исследования:
(Archived) Geotechnical engineering, powerengineering and automation
Funding:
None
Similar articles
Experience of development and implementation of nanostructured coatings for protection of metal structures at the enterprise of mining industry
2007 A. G. Syrkov, I. V. Pleskunov, S. A. Ignatiev, E. V. Remzova
Slaughtering electro-thermogenerator for combined thermal influence on productive formations of high-viscosity oil
2007 D. N. Markushev
Development of technologies for killing and stimulation of oil wells during underground workover
2007 M. K. Rogachev, D. V. Mardashov, K. V. Strizhnev