Submit an Article
Become a reviewer
Vol 173
Pages:
71-74
Download volume:
RUS
Article

High-voltage electric drive of gas pumping units

Authors:
A. A. Grigoriev
About authors
  • Postgraduate student G.V. Plekhanov Saint Petersburg Mining Institute
Date submitted:
2006-11-14
Date accepted:
2007-01-14
Date published:
2007-12-29

Abstract

Some aspects in application of various designs of drives for high-speed turbocompressors (ТС) for gas-main pipelines are considered. A comparative estimation of the efficiency parameters is carried out for gas-compressor units (GCU) equipped with variable-frequency electric drive and gas turbines. A technique to select the drive type for turbocompressors is described.

Область исследования:
(Archived) Geotechnical engineering, powerengineering and automation
Funding:

None

Go to volume 173

Similar articles

Justification of rational parameters of prospective technological schemes of layer mining of thick polohugol beds
2007 S. A. Sidorenko, A. A. Sidorenko, D. Yu. Nikishin
Economic evaluation of hydrocarbon fields of Sakhalin Island shelf
2007 D. M. Metkin
Environmental and economic aspects of diversification of the regional market of heat and energy resources
2007 A. A. Boltenkov
Influence of engineering-geological and geo-ecological conditions on development of deformations and destruction of underground structures lining in St. Petersburg
2007 E. Yu. Shatskaya
Methodical aspects of evaluation of the role of geomechanical conditions of coal-bearing massifs in formation of safe conditions of mining of high-gas-bearing coal seams of the Pechora basin
2007 O. V. Kovalev, S. A. Vasiliev, I. Yu. Thorikov, K. A. Bondarev
Development of technologies for killing and stimulation of oil wells during underground workover
2007 M. K. Rogachev, D. V. Mardashov, K. V. Strizhnev