Risk assessment of decisions at designing of open pits

Authors:
S. I. Fomin1
A. S. Semenov2
About authors
  • 1 — Associate professor G.V. Plekhanov Saint Petersburg Mining University
  • 2 — Research assistant G.V. Plekhanov Saint Petersburg Mining University
Date submitted:
2006-11-28
Date accepted:
2007-01-29
Date published:
2007-12-29

Abstract

The problem of accuracy and reliability of design decisions is a characteristic feature of the present stage in development of all material production spheres, including the mining industry. A whole range of unresolved problems still exists in enhancing reliability of open-pits designing. A lot of research publications are investigating interrelations of the accuracy and uncertainty categories with reference to specific conditions in order to solve practical problems. Scientific research in decision-making techniques in conditions of uncertainty and risk, in development of heuristic approaches, methods of stochastic modelling and programming are of utmost interest in terms of open-pit designing.

Область исследования:
(Archived) Topical issues in mining of ore and nonmetallic minerals
Funding:

None

Go to volume 173

Similar articles

Forecast of promising oil-geological objects on the basis of the analysis of the structure and location of the identified local structures, controlling oil deposits in the Baltic OGO
2007 D. Yu. Balykov, A. A. Otmas
Reinforcement of foundations and bases of buildings and structures by drill injection wells for St. Petersburg conditions
2007 A. I. Korovin
Development of structure and algorithm of control of escalator drive with basic coordinates observer
2007 A. S. Ivanov
The Art of Feng Shui
2007 L. N. Andreeva
Diagnostics of dielectric coatings by electro-static methods
2007 N. S. Pshchelko, I. I. Pavlikov
Georadiolocation researches of hydraulic engineering and transport constructions
2007 N. N. Efimova, S. M. Danilev