Submit an Article
Become a reviewer
Vol 173
Pages:
57-59
Download volume:
RUS

Risk assessment of decisions at designing of open pits

Authors:
S. I. Fomin1
A. S. Semenov2
About authors
  • 1 — Associate professor G.V. Plekhanov Saint Petersburg Mining University
  • 2 — Research assistant G.V. Plekhanov Saint Petersburg Mining University
Date submitted:
2006-11-28
Date accepted:
2007-01-29
Date published:
2007-12-29

Abstract

The problem of accuracy and reliability of design decisions is a characteristic feature of the present stage in development of all material production spheres, including the mining industry. A whole range of unresolved problems still exists in enhancing reliability of open-pits designing. A lot of research publications are investigating interrelations of the accuracy and uncertainty categories with reference to specific conditions in order to solve practical problems. Scientific research in decision-making techniques in conditions of uncertainty and risk, in development of heuristic approaches, methods of stochastic modelling and programming are of utmost interest in terms of open-pit designing.

Go to volume 173

Similar articles

Improvement of organizational-economic mechanism of reproduction of mineral raw material base of oil industry
2007 N. V. Pashkevich, L. A. Nikolaychuk
Influence of plasma-chemical processes on parameters of smoldering discharges in argon at high and low pressures
2007 A. A. Kudryavtsev, A. V. Morin, A. S. Mustafaev
Mathematical modeling of aluminum solution decomposition process
2007 D. A. Kremcheeva
The Art of Feng Shui
2007 L. N. Andreeva
Experimental evaluation of transmission condition on the stand with closed power flow
2007 A. S. Fokin, A. A. Poddubnaya, S. L. Ivanov
Reinforcement of foundations and bases of buildings and structures by drill injection wells for St. Petersburg conditions
2007 A. I. Korovin