Risk assessment of decisions at designing of open pits

Authors:
S. I. Fomin1
A. S. Semenov2
About authors
  • 1 — Associate professor G.V. Plekhanov Saint Petersburg Mining University
  • 2 — Research assistant G.V. Plekhanov Saint Petersburg Mining University
Date submitted:
2006-11-28
Date accepted:
2007-01-29
Date published:
2007-12-29

Abstract

The problem of accuracy and reliability of design decisions is a characteristic feature of the present stage in development of all material production spheres, including the mining industry. A whole range of unresolved problems still exists in enhancing reliability of open-pits designing. A lot of research publications are investigating interrelations of the accuracy and uncertainty categories with reference to specific conditions in order to solve practical problems. Scientific research in decision-making techniques in conditions of uncertainty and risk, in development of heuristic approaches, methods of stochastic modelling and programming are of utmost interest in terms of open-pit designing.

Область исследования:
(Archived) Topical issues in mining of ore and nonmetallic minerals
Funding:

None

Go to volume 173

Similar articles

High-voltage electric drive of gas pumping units
2007 A. A. Grigoriev
Analysis and assessment of groundwater breakthroughs possibility during the zero cycle construction works within the Baltic Pearl multifunctional complex
2007 A. M. Zhukova
Reference complex on metrological maintenance of measurements of quantity of crude oil and oil gas
2007 A. N. Lyubchik
Economic efficiency of development of OJSC Severalmaz
2007 P. A. Zhigulevich
Justification of parameters of the technological equipment at hydraulic transportation of highly concentrated hydraulic mixtures
2007 S. E. Demyanov
Prevention of soil rock heaving in area preparatory workings
2007 A. S. Zatsepin