Abstract

The problem of accuracy and reliability of design decisions is a characteristic feature of the present stage in development of all material production spheres, including the mining industry. A whole range of unresolved problems still exists in enhancing reliability of open-pits designing. A lot of research publications are investigating interrelations of the accuracy and uncertainty categories with reference to specific conditions in order to solve practical problems. Scientific research in decision-making techniques in conditions of uncertainty and risk, in development of heuristic approaches, methods of stochastic modelling and programming are of utmost interest in terms of open-pit designing.

Область исследования:
(Archived) Topical issues in mining of ore and nonmetallic minerals
Funding:

None

Go to volume 173

Similar articles

Analysis of energy losses in hydraulic stage
2007 N. A. Ekimov
Experimental evaluation of transmission condition on the stand with closed power flow
2007 A. S. Fokin, A. A. Poddubnaya, S. L. Ivanov
Economic evaluation of hydrocarbon fields of Sakhalin Island shelf
2007 D. M. Metkin
Efficiency of innovative measures at complex use of iron ore raw materials (on the example of Mikhailovsky GOK)
2007 R. V. Korchenkov, E. A. Solovieva
Mathematical modeling of open cycle of grinding in rod mill
2007 N. V. Nikolaeva
Weighted conversion of copper matte
2007 Yu. M. Smirnov, K. I. Melnik