Submit an Article
Become a reviewer
Vol 173
Pages:
57-59
Download volume:
RUS
Article

Risk assessment of decisions at designing of open pits

Authors:
S. I. Fomin1
A. S. Semenov2
About authors
  • 1 — Associate professor G.V. Plekhanov Saint Petersburg Mining University
  • 2 — Research assistant G.V. Plekhanov Saint Petersburg Mining University
Date submitted:
2006-11-28
Date accepted:
2007-01-29
Date published:
2007-12-29

Abstract

The problem of accuracy and reliability of design decisions is a characteristic feature of the present stage in development of all material production spheres, including the mining industry. A whole range of unresolved problems still exists in enhancing reliability of open-pits designing. A lot of research publications are investigating interrelations of the accuracy and uncertainty categories with reference to specific conditions in order to solve practical problems. Scientific research in decision-making techniques in conditions of uncertainty and risk, in development of heuristic approaches, methods of stochastic modelling and programming are of utmost interest in terms of open-pit designing.

Область исследования:
(Archived) Topical issues in mining of ore and nonmetallic minerals
Go to volume 173

Similar articles

Statistical processing of the results of microstructural analysis of ice cores from deep boreholes at Vostok station (Central Antarctica)
2007 E. V. Polyakova
The Art of Feng Shui
2007 L. N. Andreeva
Application of laser-scanning technologies at mine surveying at quarries
2007 E. A. Pravdina
Increase of reliability of electric networks 6(10) kV by means of application of automatic sectionalization points
2007 E. H. Muratbakeev
Orthodox Russian Church in the 1920s
2007 V. S. Khloponina
Prevention of soil rock heaving in area preparatory workings
2007 A. S. Zatsepin