Engineering-geological peculiarities of design and construction of underground sewage collectors in St. Petersburg by microtunneling method
- 1 — LLC Construction Management No299
- 2 — LLC Construction Management No299
- 3 — LLC Construction Management No299
- 4 — G.V. Plekhanov Saint Petersburg Mining Institute
Abstract
In the concept of development of St.-Petersburg the important role plays the improvement of the general scheme of the water drain of city, including reconstruction of old and construction of new underground sewer collectors. Because of diversity and complexity of engineering-geological and hydro-geological conditions of St.-Petersburg the building of such underground constructions represents the certain difficulties. The brief review of a current condition of a sewer network of St.-Petersburg is given. Features of engineering-geological and hydro-geological conditions of construction of underground sewer collectors by microtonneling technique in different areas of city are shown. The basic provisions on studying conditions of construction and operation of the given constructions are formulated.
References
- Дашко Р.Э. Проблемы геоэкологии в геотехнике // Реконструкция городов и геотехническое строительство. 2003-2004. № 7. С.115-128.
- Отведение и очистка сточных вод Санкт-Петербурга / Под ред. Ф.В.Кармазинова. СПб: Стройиздат, 1999. 424 с.
- Шаповалов В.Т. Генеральная схема канализации Санкт-Петербурга и его пригородов до 2005 года: Концепция развития Санкт-Петербурга / В.Т.Шаповалов, С.Г.Гумен, М.С.Гоухберг // Материалы третьего съезда Санкт-Петербургского Союза НИО / Администрация Санкт-Петербурга. СПб, 1996. Т.1. С.23-27.
- Экологическая обстановка в Санкт-Петербурге и Ленинградской области в 1993-94 годах // Аналитический обзор / Ком. экологии и природ. ресурсов СПб и Лен. области. СПб, 1995. С.11-45.