Selection and substantiation of optimal order and time of drilling of water-reducing wells of drainage contour in the course of open mining of the M.V.Lomonosov deposit

Authors:
F. G. Atroshchenko1
D. A. Drugov2
R. A. Filin3
About authors
  • 1 — St. Petersburg Branch of the Institute of Geoecology, RAS
  • 2 — St. Petersburg Branch of the Institute of Geoecology, RAS
  • 3 — St. Petersburg Branch of the Institute of Geoecology, RAS
Date submitted:
2007-09-19
Date accepted:
2007-11-24
Date published:
2008-10-06

Abstract

The deposit of Lomonosov developed at a trial level, now is at a stage of transition to its fullscale development by the open way. At the same time, first of all, a single open pit is expected to fulfill the diamond pipes of the southern group – Arkhangelskaya and Karpinsky 1 and 2. In this connection the development directed on a substantiation of systems of drainage «big career» and water removals of drainage and other waters were required also. Authors, on the basis of the analysis and generalization of available data, have tried to find the optimal engineering decisions allowing essentially to raise ecological safety of work of given systems at rather low technical and economic expenses.

Область исследования:
(Archived) Problems of hydrogeological and engineering-geological conditions assessment in the development of territories
Funding:

None

Go to volume 176

Similar articles

Scientific and methodological problems of geological interpretation of the digital database of the materials of deep electrical exploration on the territory of the European part of Russia
2008 I. S. Feldman, Yu. M. Erinchek, A. S. Egorov
Use of isotope data (δ2H, δ18O, 234U/238U) in the study of permafrost degradation processes as a result of long-term climate variations
2008 I. V. Tokarev
Analysis of engineering-geological conditions of SPGGI (TU) training and production site in Kavgolovo settlement
2008 T. N. Nikolaeva, L. P. Norova, G. B. Pospekhov
Engineering-geological peculiarities of design and construction of underground sewage collectors in St. Petersburg by microtunneling method
2008 V. V. Artemyev, A. T. Artemyev, I. V. Artemyev, L. P. Artemyev
Estimation of complexity of engineering-geological conditions on the experience of Far East region
2008 S. V. Kvashuk, E. V. Fedorenko
Quantitative analysis of hydrogeochemical laws on the basis of multidimensional classification G-method
2008 A. I. Gavrishin, A. Koradini