Selection and substantiation of optimal order and time of drilling of water-reducing wells of drainage contour in the course of open mining of the M.V.Lomonosov deposit
About authors
- 1 — St. Petersburg Branch of the Institute of Geoecology, RAS
- 2 — St. Petersburg Branch of the Institute of Geoecology, RAS
- 3 — St. Petersburg Branch of the Institute of Geoecology, RAS
Abstract
The deposit of Lomonosov developed at a trial level, now is at a stage of transition to its fullscale development by the open way. At the same time, first of all, a single open pit is expected to fulfill the diamond pipes of the southern group – Arkhangelskaya and Karpinsky 1 and 2. In this connection the development directed on a substantiation of systems of drainage «big career» and water removals of drainage and other waters were required also. Authors, on the basis of the analysis and generalization of available data, have tried to find the optimal engineering decisions allowing essentially to raise ecological safety of work of given systems at rather low technical and economic expenses.
Область исследования:
(Archived) Problems of hydrogeological and engineering-geological conditions assessment in the development of territories
Funding:
None
Similar articles
Electrical exploration by MTZ method in the complex of regional oil and gas prospecting works in the European part of Russia
2008 I. S. Feldman, B. A. Okulesskiy, A. K. Suleimanov, V. N. Nikolaev, V. A. Kuncherov, S. S. Chamo
Application of 2DMTZ for oil prospecting in the delta of the St. Clee River (south-eastern Ontario, Canada)
2008 A. I. Ingerov
Engineering-geological conditions of construction of the new Polunochnoe-Obskaya railroad line
2008 V. S. Frolov, Ya. N. Volzhonok, V. I. Voitsekhovskaya
Hydrocarbon monitoring of bottom sediments of Pechora Bay (assessment of consequences of Usinsk oil spill)
2008 A. V. Kursheva, I. V. Litvinenko