Submit an Article
Become a reviewer
Vol 176
Pages:
221-225
Download volume:
RUS
Article

Selection and substantiation of optimal order and time of drilling of water-reducing wells of drainage contour in the course of open mining of the M.V.Lomonosov deposit

Authors:
F. G. Atroshchenko1
D. A. Drugov2
R. A. Filin3
About authors
  • 1 — St. Petersburg Branch of the Institute of Geoecology, RAS
  • 2 — St. Petersburg Branch of the Institute of Geoecology, RAS
  • 3 — St. Petersburg Branch of the Institute of Geoecology, RAS
Date submitted:
2007-09-19
Date accepted:
2007-11-24
Date published:
2008-10-06

Abstract

The deposit of Lomonosov developed at a trial level, now is at a stage of transition to its fullscale development by the open way. At the same time, first of all, a single open pit is expected to fulfill the diamond pipes of the southern group – Arkhangelskaya and Karpinsky 1 and 2. In this connection the development directed on a substantiation of systems of drainage «big career» and water removals of drainage and other waters were required also. Authors, on the basis of the analysis and generalization of available data, have tried to find the optimal engineering decisions allowing essentially to raise ecological safety of work of given systems at rather low technical and economic expenses.

Область исследования:
(Archived) Problems of hydrogeological and engineering-geological conditions assessment in the development of territories
Go to volume 176

Similar articles

Influence of complex hydrology on vertical props of submersible and semi-submersible drilling rigs
2008 V. V. Vasileva, T. D. Mordvina
Engineering geology and problems of disturbed land reclamation
2008 I. P. Ivanov, T. N. Nikolaeva, G. B. Pospekhov
Spectrophotometric analysis of fine-grained fraction of red-colored strata
2008 A. G. Bogatyreva
Leningrad oil shale deposit: hydrogeological, environmental and economic problems
2008 N. S. Petrov
Modern sediments of the eastern part of the Arctic Ocean and their geologic significance
2008 V. Ya. Kabankov, I. A. Andreeva
Construction of S-function at forecasting of marine equipment characteristic
2008 A. A. Voronov, V. N. Razuvaev