Engineering-geological conditions of construction of the new Polunochnoe-Obskaya railroad line

Authors:
V. S. Frolov1
Ya. N. Volzhonok2
V. I. Voitsekhovskaya3
About authors
  • 1 — JSC Lengiprotrans
  • 2 — JSC Lengiprotrans
  • 3 — JSC Lengiprotrans
Date submitted:
2007-09-03
Date accepted:
2007-11-23
Date published:
2008-10-06

Abstract

The government of Russian Federation is considering the matter of building a new railway line because it is necessary to develop resources of Ural and the northern part of Tumensky regions. The length of this new railway and passing through several climatic zones cause a great variety of complicated engineering- geological conditions and a wide range of dangerous geological processes.

Go to volume 176

Similar articles

Optical methods in environmental monitoring of ocean
2008 I. V. Portnoy, V. K. Portnoy
Construction of S-function at forecasting of marine equipment characteristic
2008 A. A. Voronov, V. N. Razuvaev
Carbonate sequences of the Middle Ordovician-Silurian of the Pechora-Barents Sea megabasin
2008 N. V. Taninskaya
Engineering-geological support of vertical shaft sinking
2008 S. V. Sergeev
Methodological principles of landscape-geoecological studies of the shelf on the example of the Barents Sea
2008 I. A. Andreeva, A. G. Zinchenko, B. G. Vanshtein, O. A. Kiiko, V. I. Petrova
Results of magnetotelluric studies on the Batolit profile (south of the Siberian platform)
2008 A. M. Pashevin, V. A. Tupitsin, V. V. Gomulskiy