Submit an Article
Become a reviewer
Vol 178
Pages:
201-206
Download volume:
RUS
Article

Development and research of the arrangement of the executive body of the tunneling complex for the mines of OJSC Metrostroy

Authors:
D. A. Jungmeister1
S. A. Ignatiev2
A. Ya. Burak3
S. A. Konovalov4
About authors
  • 1 — G.V. Plekhanov Saint Petersburg Mining Institute
  • 2 — G.V. Plekhanov Saint Petersburg Mining Institute
  • 3 — G.V. Plekhanov Saint Petersburg Mining Institute
  • 4 — OJSC Metrostroy
Date submitted:
2007-11-08
Date accepted:
2008-01-23
Date published:
2008-11-18

Abstract

In clause the variant of configuration of an agency to passed a complex for mines Metrostroja of Saint Petersburg is presented. Formulas and results of calculation of key parameters of an agency of a complex on the COMPUTER by Poderni R.J.'s technique for hydraulicimpact and modernized program KOR_N for hydraulic mills are resulted. Use of hydraulic mills of longitudinal rotation as an agency on working off of a face is proved. The cycle to passed works of a complex is stated.

Область исследования:
(Archived) Diagnostics and control of technical systems and their elements. New technologie
Go to volume 178

Similar articles

Hydraulic coarseness of coal particles
2008 A. B. Nezametdinov
Relevance of application of centralized protection with inverse dependent time-current characteristic of RXIDG type for networks with resistive neutral groundi
2008 M. A. Bychin
Automatic sectionalization in electrical networks with voltage 6-10 kV
2008 Yu. L. Zhukovskiy, E. Kh. Muratbakeev
Design and calculation methodology of double-circuit vertical belt conveyor for mining industry
2008 Yu. D. Tarasov
Prospects of improvement of technical means for catching belts of inclined and bremsberg conveyors
2008 Yu. D. Tarasov, F. V. Fedorov
Well damper
2008 Yu. D. Muraev, M. I. Kuzmin