Submit an Article
Become a reviewer
Vol 178
Pages:
47-50
Download volume:
RUS
Article

Determination of operation modes of step mine drainage systems without intermediate water collectors

Authors:
O. V. Kabanov1
D. A. Zadkov2
S. O. Kabanov3
About authors
  • 1 — G.V. Plekhanov Saint Petersburg Mining Institute
  • 2 — G.V. Plekhanov Saint Petersburg Mining Institute
  • 3 — Plant of energy protection devices
Date submitted:
2007-11-18
Date accepted:
2008-01-05
Date published:
2008-11-18

Abstract

For determination state of working ступенчатых mining водоотливных of the installation without intermediate водосборников follows to define the режимные parameters last step and use their as input at calculation previous step. For ensuring given state of working whole installation necessary to change the features a pipe line or pump.

Область исследования:
(Archived) Technological machinery and equipment of mining and oil & gas industries
Go to volume 178

Similar articles

Calculation of loads on walls of cylindro-conical hoppers.
2008 A. P. Batalov, E. A. Kremcheev
Increase of reliability of machines and mechanisms operation in underground constructions of cryolithozone
2008 A. F. Galkin
The area of existence of involute gear mesh with a given overlap coefficient
2008 A. S. Fokin, A. A. Poddubnaya, S. L. Ivanov, E. A. Kremcheev
Improvement of heat treatment regimes of cutters of road-headers for increase of their wear resistance
2008 V. I. Bolobov, V. V. Gabov, D. A. Zadkov, A. V. Tetervak
Bench studies of a manual perforator with a piston-bowl impact system
2008 A. Ya. Burak, D. A. Jungmeister, A. Yu. Vasiliev, Yu. V. Sudienkov
Calculation of parameters of pipe-water transportation of hydraulic mixtures with high concentrations of solid phase
2008 V. I. Aleksandrov, V. P. Pirozhenko, P. B. Gurkin