Abstract

In article it is offered to expand the list of parametres for an estimation of quality of geodetic networks, having added in it an indicator of topological reliability of a network. Optimum schemes of high-rise and planned geodetic constructions at which the indicator of topological reliability has the greatest possible value equal to unit are considered. Formulas for calculation of quantity of measurements in such constructions are offered and recommendations about processing of measurements in them are made.

Go to volume 180

References

  1. Визиров Ю.В. Понятие надежности геодезических пунктов и сетей // Геодезия и картография. 2004. № 8.
  2. Дьяков Б.Н. Программа, раскрывающая преимущества известного метода / Б.Н.Дьяков, Ю.В.Родионова // Геодезистъ. 2002. № 4.
  3. Маркузе Ю.И. Основы уравнительных вычислений: Учеб. пособие для вузов. М.: Недра, 1990.

Similar articles

Selection of stripping parameters at use of environmental geotechnologies of steeply falling veins development
2009 G. V. Sabyanin
Improvement of the technology of calculation of dangerous distances for rock pieces at mass explosions at quarries
2009 A. V. Zharovkin
Complex of measures on restoration of quality of natural environment on industrial object
2009 V. I. Reshnyak, V. A. Zhigulskiy
Justification of technological solutions for underground development of copper and cauldron deposits of the Urals
2009 E. Yu. Meshcheryakov
Increase of explosion efficiency of underwater bottom charges by changing the relative depth of charge immersion
2009 Dam Chong Tkhang
Ways to optimize the parameters of drilling and blasting operations during mining of chambers of Maleevsky mine by the method of borehole charges on the basis of consideration of rock mass properties
2009 V. A. Artemov, S. V. Shcherbich