Submit an Article
Become a reviewer
Vol 180
Pages:
160-163
Download volume:
RUS
Article

Complex mechanization of blasting operations at underground mines of Mountain Shoria and Khakassia

Authors:
I. V. Mashukov1
A. F. Myunkh2
V. K. Dzhalov3
V. N. Filippov4
A. L. Loskutov5
About authors
  • 1 — OJSC VostNIGRI
  • 2 — OJSC Evrazruda
  • 3 — OJSC Evrazruda
  • 4 — Mountain-Shorsky branch OJSC «Evrazruda»
  • 5 — Mountain-Shorsky branch OJSC «Evrazruda»
Date submitted:
2008-07-08
Date accepted:
2008-09-05
Date published:
2009-02-18

Abstract

For decrease in a share of manual skills, increase of productivity on all operations of processing explosive, reductions of number of the workers involved from other sites and restriction of a circle of persons, admitted(allowed) to the reference with explosive on underground mines Mountain Shorie and Khakassias 70-80 years have been developed and introduced circuits complex mechanization of explosive works.

Область исследования:
(Archived) Blasting, explosives and means of mechanization of their application
Funding:

None

Go to volume 180

Similar articles

Methodology for determination of ideal detonation parameters of emulsion idealization capability
2009 N. G. Demchenko
Blasting technology in cryolithozone conditions
2009 P. N. Vasiliev, S. M. Tkach
Improvement of the technology of calculation of dangerous distances for rock pieces at mass explosions at quarries
2009 A. V. Zharovkin
Integral estimation of blasting impact on atmosphere
2009 V. I. Papichev
Justification of preparation excavations fastening by combination of rod and rope anchor fasteners
2009 V. M. Shik, A. A. Romashkevich
Selection of stripping parameters at use of environmental geotechnologies of steeply falling veins development
2009 G. V. Sabyanin