Complex mechanization of blasting operations at underground mines of Mountain Shoria and Khakassia
About authors
- 1 — OJSC VostNIGRI
- 2 — OJSC Evrazruda
- 3 — OJSC Evrazruda
- 4 — Mountain-Shorsky branch OJSC «Evrazruda»
- 5 — Mountain-Shorsky branch OJSC «Evrazruda»
Abstract
For decrease in a share of manual skills, increase of productivity on all operations of processing explosive, reductions of number of the workers involved from other sites and restriction of a circle of persons, admitted(allowed) to the reference with explosive on underground mines Mountain Shorie and Khakassias 70-80 years have been developed and introduced circuits complex mechanization of explosive works.
Область исследования:
(Archived) Blasting, explosives and means of mechanization of their application
Similar articles
Determination of rational parameters of foam plastic elements for creation of air spaces of borehole charges
2009 A. V. Leshchinskiy, E. B. Shevkun
Formation of longitudinal and volumetric waves in the vicinity of a cavity during explosive explosion in rocks
2009 M. G. Menzhulin, V. E. Brovin
Ways to optimize the parameters of drilling and blasting operations during mining of chambers of Maleevsky mine by the method of borehole charges on the basis of consideration of rock mass properties
2009 V. A. Artemov, S. V. Shcherbich