Submit an Article
Become a reviewer
Vol 181
Pages:
138-140
Download volume:
RUS
Article

Justification of parameters and design of auger loader of tunneling-cleaning combine

Authors:
D. A. Sidyakin
About authors
  • Perm State Technical University
Date submitted:
2008-08-21
Date accepted:
2008-10-17
Date published:
2009-03-20

Abstract

It is established that the hub diameter critically affects the performance of the auger-type heading-and-winning machines. To secure the maximal output the hub diameter should be 3.3 times smaller than the auger blade diameter.

Область исследования:
(Archived) Geotechnical engineering, powerengineering and automation
Go to volume 181

Similar articles

Calculation and optimization of technological scheme of lead-zinc ore enrichment of the Quartzitovaya Sopka deposit
2009 A. V. Korznikov
Improvement of economic evaluation of investment projects in oil and gas industry
2009 A. V. Aprelova
Method of research of influence of deposit eccentricity on minimum current stripping volumes
2009 A. V. Polovinko, G. A. Kholodnyakov, D. G. Kholodnyakov
About compensation of reactive power in the schemes of power supply of oil and gas producing enterprise
2009 P. A. Guriev
Complex of geophysical signs of localization of gold-sulphide type mineralization (Lena gold ore district)
2009 S. V. Sokolov
Material composition of ore of host rocks of the Amurskoye zinc deposit (Southern Urals)
2009 Yu. N. Spesivtseva