Justification of reliability of cantilever-rope reinforcement of deep shafts
Authors:
About authors
- G.V. Plekhanov Saint Petersburg State Mining Institute
Abstract
A possibility of combined operation of the rope and console shaft armouring is studied. A device is offered to secure their combined operation. Calculation dependences are given to assess stress in the device elements as well as graphical dependences to select sizes of these elements.
Область исследования:
(Archived) Geodesy, geomechanics and underground construction
Similar articles
Method of research of influence of deposit eccentricity on minimum current stripping volumes
2009 A. V. Polovinko, G. A. Kholodnyakov, D. G. Kholodnyakov
Material composition of ore of host rocks of the Amurskoye zinc deposit (Southern Urals)
2009 Yu. N. Spesivtseva
Calculation and optimization of technological scheme of lead-zinc ore enrichment of the Quartzitovaya Sopka deposit
2009 A. V. Korznikov
Formation of environmental and economic mechanisms of management in oil and gas complex taking into account new global requirements
2009 A. E. Cherepovitsyn, L. S. Sinkov