Reconstruction of vertical shaft of Uzelginsky mine

Authors:
D. E. Zhurov
About authors
  • Shakhty Institute of South Russian State Technical University (Novocherkassk Polytechnic Institute)
Date submitted:
2008-08-17
Date accepted:
2008-10-27
Date published:
2009-03-20

Abstract

The paper studies details of the draft plan for skip shaft reconstruction at the Uzelginsky Ore Mine. Methods of loading chamber construction at the –340 m horizon and improvement of the shaft lining at the construction level are given a detailed description of.

Область исследования:
(Archived) Geodesy, geomechanics and underground construction
Funding:

None

Go to volume 181

Similar articles

Optimization of operation modes of gas pumping units in the system of compressor station compression
2009 V. V. Kichatov
Geoportal as a tool of territory management
2009 E. A. Shcherbatova
Respirator-conditioner for work in the conditions of the North
2009 N. A. Kotenkov
Types of metasomatites of the Buruktalskoye deposit of hypergene nickel-lead ores, Southern Urals
2009 S. O. Ryzhkova
Management of the process of purposeful creation of technogenic deposit of certain quality
2009 A. Ishimov, K. Drebenshtedt
Zinc sorption on montmorillonite
2009 Ondrej Kozak