Reconstruction of vertical shaft of Uzelginsky mine
Authors:
About authors
- Shakhty Institute of South Russian State Technical University (Novocherkassk Polytechnic Institute)
Abstract
The paper studies details of the draft plan for skip shaft reconstruction at the Uzelginsky Ore Mine. Methods of loading chamber construction at the –340 m horizon and improvement of the shaft lining at the construction level are given a detailed description of.
Область исследования:
(Archived) Geodesy, geomechanics and underground construction
Funding:
None
Similar articles
Study of complex influence of metallurgical enterprises on the environmental state of Novokuznetsk
2009 O. O. Medvedskaya
Justification of optimal parameters of associated minerals stockpiles
2009 M. M. Yakubovsky, G. A. Kholodnyakov
Organization of mining works at preparation of new horizons at watered open pits
2009 I. I. Dudanov, V. S. Avraamov, D. N. Ligotsky, G. A. Kholodnyakov
Influence of blast waves on the stressed state of the barrier pillar at carrying out of parallel excavations
2009 Yu. N. Antonov