Submit an Article
Become a reviewer
Vol 181
Pages:
72-75
Download volume:
RUS
Article

Peculiarities of maintenance of preparatory workings in the zones of increased mining pressure

Authors:
A. V. Rogachkov
About authors
  • G.V. Plekhanov Saint Petersburg State Mining Institute
Date submitted:
2008-08-14
Date accepted:
2008-10-12
Date published:
2009-03-20

Abstract

The article studies features of development gallery maintenance in zones of increased formation pressure in the Kuznetsk Coal Basin. Experience has been analyzed of applying the cable roof bolting in overworked development galleries in mining superimposed coal seams. Parameters of cable roof bolting have been determined which impact on its performance in conditions of increased formation pressure.

Область исследования:
(Archived) Topical issues in mining of ore and nonmetallic minerals
Funding:

None

Go to volume 181

Similar articles

Informativeness of transient characteristics of fast processes of induced polarization in the search for gold-sulfide ores
2009 M. A. Beznosov
Establishment of regularities of action of single charge explosion at modeling on equivalent materials
2009 P. N. Shulgin
Reconstruction of vertical shaft of Uzelginsky mine
2009 D. E. Zhurov
Justification of the parameters of the chamber and pillar system of development during the mining of declivity coal seams
2009 V. A. Shuklin
Prospects of development of ferrous metals of Polar and Subpolar Urals
2009 A. B. Anisimova
Electromechanical complex of equipment on the basis of hydrofied model plant
2009 E. G. Chernenko