Peculiarities of maintenance of preparatory workings in the zones of increased mining pressure

Authors:
A. V. Rogachkov
About authors
  • G.V. Plekhanov Saint Petersburg State Mining Institute
Date submitted:
2008-08-14
Date accepted:
2008-10-12
Date published:
2009-03-20

Abstract

The article studies features of development gallery maintenance in zones of increased formation pressure in the Kuznetsk Coal Basin. Experience has been analyzed of applying the cable roof bolting in overworked development galleries in mining superimposed coal seams. Parameters of cable roof bolting have been determined which impact on its performance in conditions of increased formation pressure.

Область исследования:
(Archived) Topical issues in mining of ore and nonmetallic minerals
Go to volume 181

Similar articles

Improvement of quality of manufacture of petrochemical devices and gas-oil pipelines by application of vibration treatment during welding
2009 O. F. Khafizova
Material composition of ore of host rocks of the Amurskoye zinc deposit (Southern Urals)
2009 Yu. N. Spesivtseva
Modeling of movement of cleaning and diagnostics means on a section of oil pipeline
2009 P. K. Kalashnikov, A. M. Kuvichko
Reconstruction of vertical shaft of Uzelginsky mine
2009 D. E. Zhurov
Justification of the parameters of the chamber and pillar system of development during the mining of declivity coal seams
2009 V. A. Shuklin
Electromechanical complex of equipment on the basis of hydrofied model plant
2009 E. G. Chernenko