Submit an Article
Become a reviewer
Vol 181
Pages:
72-75
Download volume:
RUS
Article

Peculiarities of maintenance of preparatory workings in the zones of increased mining pressure

Authors:
A. V. Rogachkov
About authors
  • G.V. Plekhanov Saint Petersburg State Mining Institute
Date submitted:
2008-08-14
Date accepted:
2008-10-12
Date published:
2009-03-20

Abstract

The article studies features of development gallery maintenance in zones of increased formation pressure in the Kuznetsk Coal Basin. Experience has been analyzed of applying the cable roof bolting in overworked development galleries in mining superimposed coal seams. Parameters of cable roof bolting have been determined which impact on its performance in conditions of increased formation pressure.

Область исследования:
(Archived) Topical issues in mining of ore and nonmetallic minerals
Go to volume 181

Similar articles

Justification of reliability of cantilever-rope reinforcement of deep shafts
2009 D. A. Kotikov
Hydraulic calculation of multiphase hydrocarbon flow with application of the OLGA dynamic modeling system
2009 D. A. Shchekotov
Formation of environmental and economic mechanisms of management in oil and gas complex taking into account new global requirements
2009 A. E. Cherepovitsyn, L. S. Sinkov
Prospects of development of ferrous metals of Polar and Subpolar Urals
2009 A. B. Anisimova
Search of ways to increase technological indicators at processing of charge of rich and copper ores
2009 I. M. Zemenkov
Cutting technology with point attack picks on roadheaders and its challenges
2009 Hubert Kargl