Submit an Article
Become a reviewer
Vol 181
Pages:
72-75
Download volume:
RUS
Article

Peculiarities of maintenance of preparatory workings in the zones of increased mining pressure

Authors:
A. V. Rogachkov
About authors
  • G.V. Plekhanov Saint Petersburg State Mining Institute
Date submitted:
2008-08-14
Date accepted:
2008-10-12
Date published:
2009-03-20

Abstract

The article studies features of development gallery maintenance in zones of increased formation pressure in the Kuznetsk Coal Basin. Experience has been analyzed of applying the cable roof bolting in overworked development galleries in mining superimposed coal seams. Parameters of cable roof bolting have been determined which impact on its performance in conditions of increased formation pressure.

Область исследования:
(Archived) Topical issues in mining of ore and nonmetallic minerals
Funding:

None

Go to volume 181

Similar articles

Monitoring on-line by the stability of the Кalman filter used in the vectorial control system for the speed of an induction motor
2009 Nadia Stoicuta, Olimpiu Stoicuta
Optimization of a mode of thermal modification of torphomineral binding materials
2009 E. O. Savel'eva
Geotechnology of processing of pyrite cinders
2009 N. B. Podoksenova
Method of determination of friction coefficient at rolling of billets on crimping and thick plate mills
2009 M. V. Tsymbalyuk
Analysis of the system of state regulation of subsoil use
2009 A. S. Krasnaya
Substantiation of a reservoir model for one of the fields in the Ob River Region in order to improve development efficiency
2009 A. A. Shelushenko