Submit an Article
Become a reviewer
Vol 181
Pages:
55-57
Download volume:
RUS
Article

Justification of the parameters of the chamber and pillar system of development during the mining of declivity coal seams

Authors:
V. A. Shuklin
About authors
  • Kuzbass State Technical University
Date submitted:
2008-08-25
Date accepted:
2008-10-11
Date published:
2009-03-20

Abstract

The paper offers analysis of selected parameters for room-and-pillar mining system basing on in-situ tests in mining of 6-6A Strata at the Raspadskaya Mine.

Область исследования:
Mining
Go to volume 181

Similar articles

Numerical simulations of continuous mining machine
2009 Adam Stachura, Damian Gasiorek
Waste space and its influence on the operation modes of the main ventilation fans
2009 N. N. Mokhirev, M. Yu. Postnikova
Comparative characterization of heavy metals content in bottom sediments of the northern part of the Gulf of Finland (Kotka, Gogland, Vysotsk)
2009 T. V. Bodryakov, E. A. Sinkova, N. B. Malysheva
Prospects of development of ferrous metals of Polar and Subpolar Urals
2009 A. B. Anisimova
Peculiarities of maintenance of preparatory workings in the zones of increased mining pressure
2009 A. V. Rogachkov
Informativeness of transient characteristics of fast processes of induced polarization in the search for gold-sulfide ores
2009 M. A. Beznosov