Submit an Article
Become a reviewer
Vol 181
Pages:
55-57
Download volume:
RUS
Article

Justification of the parameters of the chamber and pillar system of development during the mining of declivity coal seams

Authors:
V. A. Shuklin
About authors
  • Kuzbass State Technical University
Date submitted:
2008-08-25
Date accepted:
2008-10-11
Date published:
2009-03-20

Abstract

The paper offers analysis of selected parameters for room-and-pillar mining system basing on in-situ tests in mining of 6-6A Strata at the Raspadskaya Mine.

Область исследования:
Mining
Funding:

None

Go to volume 181

Similar articles

Justification of reliability of cantilever-rope reinforcement of deep shafts
2009 D. A. Kotikov
Small speed asymptotic stability study of a speed vector control system for an induction motor that contains in its loop a Gopinath observer
2009 Olimpiu Stoicuta, Nadia Stoicuta, Teodor Pana
Studies on decomposition of artificial scheelite by sintering with ammonium chloride
2009 A. V. Esipenko, A. A. Sotnikov
Jaw crusher of double crushing
2009 A. I. Dashkevich
Use of stochastic models for hydrodynamic analysis of water intakes operation
2009 Yu. P. Starodubova
Theoretical analysis of thermal regime of foundations and base soils
2009 D. N. Gorobtsov