Submit an Article
Become a reviewer
Vol 181
Pages:
55-57
Download volume:
RUS
Article

Justification of the parameters of the chamber and pillar system of development during the mining of declivity coal seams

Authors:
V. A. Shuklin
About authors
  • Kuzbass State Technical University
Date submitted:
2008-08-25
Date accepted:
2008-10-11
Date published:
2009-03-20

Abstract

The paper offers analysis of selected parameters for room-and-pillar mining system basing on in-situ tests in mining of 6-6A Strata at the Raspadskaya Mine.

Область исследования:
Mining
Funding:

None

Go to volume 181

Similar articles

Numerical simulations of continuous mining machine
2009 Adam Stachura, Damian Gasiorek
Material composition of ore of host rocks of the Amurskoye zinc deposit (Southern Urals)
2009 Yu. N. Spesivtseva
Estimation of the level of maintainability of complex energy components under operating conditions
2009 I. I. Nikolaenkov
About compensation of reactive power in the schemes of power supply of oil and gas producing enterprise
2009 P. A. Guriev
Justification of reliability of cantilever-rope reinforcement of deep shafts
2009 D. A. Kotikov
Improvement of economic evaluation of investment projects in oil and gas industry
2009 A. V. Aprelova