Submit an Article
Become a reviewer
Vol 181
Pages:
55-57
Download volume:
RUS
Article

Justification of the parameters of the chamber and pillar system of development during the mining of declivity coal seams

Authors:
V. A. Shuklin
About authors
  • Kuzbass State Technical University
Date submitted:
2008-08-25
Date accepted:
2008-10-11
Date published:
2009-03-20

Abstract

The paper offers analysis of selected parameters for room-and-pillar mining system basing on in-situ tests in mining of 6-6A Strata at the Raspadskaya Mine.

Область исследования:
Mining
Go to volume 181

Similar articles

Economical model for maintenance of electric distribution system
2009 Juha Korpijärvi
Waste space and its influence on the operation modes of the main ventilation fans
2009 N. N. Mokhirev, M. Yu. Postnikova
Calculation and optimization of technological scheme of lead-zinc ore enrichment of the Quartzitovaya Sopka deposit
2009 A. V. Korznikov
Monitoring analysis of the state of mineral raw material base of mining enterprise
2009 Yu. V. Lyubek, N. V. Stolbovskaya
Zinc sorption on montmorillonite
2009 Ondrej Kozak
Influence of blast waves on the stressed state of the barrier pillar at carrying out of parallel excavations
2009 Yu. N. Antonov