Submit an Article
Become a reviewer
Vol 181
Pages:
55-57
Download volume:
RUS
Article

Justification of the parameters of the chamber and pillar system of development during the mining of declivity coal seams

Authors:
V. A. Shuklin
About authors
  • Kuzbass State Technical University
Date submitted:
2008-08-25
Date accepted:
2008-10-11
Date published:
2009-03-20

Abstract

The paper offers analysis of selected parameters for room-and-pillar mining system basing on in-situ tests in mining of 6-6A Strata at the Raspadskaya Mine.

Область исследования:
Mining
Funding:

None

Go to volume 181

Similar articles

Economical model for maintenance of electric distribution system
2009 Juha Korpijärvi
Reconstruction of vertical shaft of Uzelginsky mine
2009 D. E. Zhurov
Influence of blast waves on the stressed state of the barrier pillar at carrying out of parallel excavations
2009 Yu. N. Antonov
Processing of gold-bearing ore of Berezovskoye deposit with the use of dry enrichment methods
2009 K. A. Moskalev
Study of regularities of copper and zinc extraction from model solutions of sub-dump water
2009 M. I. Zubchuk
Analysis of the system of state regulation of subsoil use
2009 A. S. Krasnaya