Submit an Article
Become a reviewer
Vol 181
Pages:
61-63
Download volume:
RUS
Article

Organization of mining works at preparation of new horizons at watered open pits

Authors:
I. I. Dudanov1
V. S. Avraamov2
D. N. Ligotsky3
G. A. Kholodnyakov4
About authors
  • 1 — G.V. Plekhanov Saint Petersburg State Mining Institute
  • 2 — G.V. Plekhanov Saint Petersburg State Mining Institute
  • 3 — G.V. Plekhanov Saint Petersburg State Mining Institute
  • 4 — G.V. Plekhanov Saint Petersburg State Mining Institute
Date submitted:
2008-08-04
Date accepted:
2008-10-11
Date published:
2009-03-20

Abstract

To prevent decline in quarry production and create favorable operating conditions for the equipment in advancing watered open-pits it is recommended to employ hydraulic back shovels, which due to their cinematic and design features can perform downward digging while being located on the dry upper bench surface.

Область исследования:
(Archived) Topical issues in mining of ore and nonmetallic minerals
Funding:

None

Go to volume 181

Similar articles

Waste space and its influence on the operation modes of the main ventilation fans
2009 N. N. Mokhirev, M. Yu. Postnikova
Method of determination of friction coefficient at rolling of billets on crimping and thick plate mills
2009 M. V. Tsymbalyuk
Hydraulic calculation of multiphase hydrocarbon flow with application of the OLGA dynamic modeling system
2009 D. A. Shchekotov
Use of stochastic models for hydrodynamic analysis of water intakes operation
2009 Yu. P. Starodubova
Development of the device and technology of diagnostics of anchoring of rocks and building structures
2009 E. A. Voznesensky
Geoportal as a tool of territory management
2009 E. A. Shcherbatova