Submit an Article
Become a reviewer
Vol 181
Pages:
61-63
Download volume:
RUS
Article

Organization of mining works at preparation of new horizons at watered open pits

Authors:
I. I. Dudanov1
V. S. Avraamov2
D. N. Ligotsky3
G. A. Kholodnyakov4
About authors
  • 1 — G.V. Plekhanov Saint Petersburg State Mining Institute
  • 2 — G.V. Plekhanov Saint Petersburg State Mining Institute
  • 3 — G.V. Plekhanov Saint Petersburg State Mining Institute
  • 4 — G.V. Plekhanov Saint Petersburg State Mining Institute
Date submitted:
2008-08-04
Date accepted:
2008-10-11
Date published:
2009-03-20

Abstract

To prevent decline in quarry production and create favorable operating conditions for the equipment in advancing watered open-pits it is recommended to employ hydraulic back shovels, which due to their cinematic and design features can perform downward digging while being located on the dry upper bench surface.

Область исследования:
(Archived) Topical issues in mining of ore and nonmetallic minerals
Go to volume 181

Similar articles

Respirator-conditioner for work in the conditions of the North
2009 N. A. Kotenkov
Planning of effective utilization of production and resource potential in oil production
2009 M. S. Yumsunov
Investigation of possibility of enrichment of chromite ores of Sakseyskoye deposit
2009 K. A. Stepanova
Geotechnology of processing of pyrite cinders
2009 N. B. Podoksenova
Application of asynchronous motors with double supply and vector regulation as generators for wind power stations
2009 I. Imenokhoev
Increase of efficiency of methods of sludge pits reclamation
2009 M. M. Malyshkin