Submit an Article
Become a reviewer
Vol 181
Pages:
61-63
Download volume:
RUS
Article

Organization of mining works at preparation of new horizons at watered open pits

Authors:
I. I. Dudanov1
V. S. Avraamov2
D. N. Ligotsky3
G. A. Kholodnyakov4
About authors
  • 1 — G.V. Plekhanov Saint Petersburg State Mining Institute
  • 2 — G.V. Plekhanov Saint Petersburg State Mining Institute
  • 3 — G.V. Plekhanov Saint Petersburg State Mining Institute
  • 4 — G.V. Plekhanov Saint Petersburg State Mining Institute
Date submitted:
2008-08-04
Date accepted:
2008-10-11
Date published:
2009-03-20

Abstract

To prevent decline in quarry production and create favorable operating conditions for the equipment in advancing watered open-pits it is recommended to employ hydraulic back shovels, which due to their cinematic and design features can perform downward digging while being located on the dry upper bench surface.

Область исследования:
(Archived) Topical issues in mining of ore and nonmetallic minerals
Go to volume 181

Similar articles

Numerical simulations of continuous mining machine
2009 Adam Stachura, Damian Gasiorek
Research of influence of magnetic field on foaming properties of VKP reagent and flotation of graphite ore of different sites of Taiga deposit
2009 I. R. Masyagutova
Study of complex influence of metallurgical enterprises on the environmental state of Novokuznetsk
2009 O. O. Medvedskaya
Electromechanical complex of equipment on the basis of hydrofied model plant
2009 E. G. Chernenko
Research of regularities of salt rocks strength change from conditions of occurrence
2009 A. Yu. Lytkina
Substantiation of a reservoir model for one of the fields in the Ob River Region in order to improve development efficiency
2009 A. A. Shelushenko