Submit an Article
Become a reviewer
Vol 181
Pages:
61-63
Download volume:
RUS
Article

Organization of mining works at preparation of new horizons at watered open pits

Authors:
I. I. Dudanov1
V. S. Avraamov2
D. N. Ligotsky3
G. A. Kholodnyakov4
About authors
  • 1 — G.V. Plekhanov Saint Petersburg State Mining Institute
  • 2 — G.V. Plekhanov Saint Petersburg State Mining Institute
  • 3 — G.V. Plekhanov Saint Petersburg State Mining Institute
  • 4 — G.V. Plekhanov Saint Petersburg State Mining Institute
Date submitted:
2008-08-04
Date accepted:
2008-10-11
Date published:
2009-03-20

Abstract

To prevent decline in quarry production and create favorable operating conditions for the equipment in advancing watered open-pits it is recommended to employ hydraulic back shovels, which due to their cinematic and design features can perform downward digging while being located on the dry upper bench surface.

Область исследования:
(Archived) Topical issues in mining of ore and nonmetallic minerals
Funding:

None

Go to volume 181

Similar articles

Peculiarities of maintenance of preparatory workings in the zones of increased mining pressure
2009 A. V. Rogachkov
Justification of reliability of cantilever-rope reinforcement of deep shafts
2009 D. A. Kotikov
Respirator-conditioner for work in the conditions of the North
2009 N. A. Kotenkov
Cutting technology with point attack picks on roadheaders and its challenges
2009 Hubert Kargl
Formation of environmental and economic mechanisms of management in oil and gas complex taking into account new global requirements
2009 A. E. Cherepovitsyn, L. S. Sinkov
Jaw crusher of double crushing
2009 A. I. Dashkevich