Research article
Mining

Justification of the parameters of the chamber and pillar system of development during the mining of declivity coal seams

Authors:
V. A. Shuklin
About authors
  • Kuzbass State Technical University
Date submitted:
2008-08-25
Date accepted:
2008-10-11
Date published:
2009-02-01

Abstract

The paper offers analysis of selected parameters for room-and-pillar mining system basing on in-situ tests in mining of 6-6A Strata at the Raspadskaya Mine.

Go to volume 181

Similar articles

Calculation and optimization of technological scheme of lead-zinc ore enrichment of the Quartzitovaya Sopka deposit
2009 A. V. Korznikov
Method of determination of friction coefficient at rolling of billets on crimping and thick plate mills
2009 M. V. Tsymbalyuk
Influence of blast waves on the stressed state of the barrier pillar at carrying out of parallel excavations
2009 Yu. N. Antonov
About compensation of reactive power in the schemes of power supply of oil and gas producing enterprise
2009 P. A. Guriev
Study of complex influence of metallurgical enterprises on the environmental state of Novokuznetsk
2009 O. O. Medvedskaya
Numerical simulations of continuous mining machine
2009 Adam Stachura, Damian Gasiorek