Submit an Article
Become a reviewer
Vol 183
Pages:
205-209
Download volume:
RUS
Article

Engineering-geocryological problems оf the «Amur» federal highway Chita – Khabarovsk

Authors:
V. G. Kondratiev1
S. V. Soboleva2
About authors
  • 1 — Professor Chita State University
  • 2 — Senior Research Fellow TransIGEM
Date submitted:
2008-10-02
Date accepted:
2008-12-23
Date published:
2009-12-11

Abstract

The engineering-geocryological conditions of the 2165-km-long Chita-Khabarovsk «Amur» federal highway, which is one of the greatest recent constructions in Russia, are analized. The examples of the negative effect of the engineering-geocryological processes on the highway stability and reliability are presented. The concept of the system of engineering-geocryological monitoring of the «Amur» highway have been developed in order to maintain stability and reliability of the «Amur» highway during its exploration.

Область исследования:
(Archived) Hydrogeology, engineering geology
Keywords:
federal highway engineering-geocryological conditions monitoring
Go to volume 183

References

  1. Ivanov N.F. «Amur» combines Russia. M.: Informavtodor, 2003. 200 p.
  2. Kondratiev V.G. Technical-economical substantiation of the roadbed stabilization on high-icy permafrost grounds of one of the areas of the Zabaikalie railroad // Railway Transpot. Ser. «Construction. Designing»: EI/TsNIITEL. 1997. Issue 2, pp.1-53.
  3. Kondratiev V.G. On geocryological substantiation of prospecting, designing, construction and exploitation of the Chita-Khabarovsk highway // Materials Sci. Pract. Conference «Problems in designing and construction of the Chita-Khabarovsk Highway». IrkutskhydrodorNII. Irkutsk, 2003, pp.57-63.

Similar articles

Investigations of the mechanism of methane desorption in coal saturation with carbon dioxide
2009 A. T. Karmansky
Geoelectrical investigation of promising oil and gas bearing areas in the south part of Siberian plat-form
2009 N. N. Nevedrova, M. I. Epov, A. M. Sanchaa, S. M. Babushkin
Appearance of entropy principle in distribution оf the gold mass while formation of minable gold mineralization
2009 S. V. Sendek
Prospects of nickel industry in the Urals in the light of ore field structure study in supergene nickel deposits
2009 N. I. Vorontsova, I. V. Talovina, V. G. Lazarenkov, S. O. Ryzhkova, O. P. Mezentseva
Application of electrical prospecting in combination with seismic prospecting for the geological section prediction and search of hydrocarbon deposits
2009 V. A. Kuzin, A. A. Korukhova
New source of noble corundum in Kenya
2009 L. V. Kulachkov, K. Kamwathi, V. L. Shterhun