Simulation of the stress-strain state forming around the vertical mine in the field of tectonically fractured massif
Authors:
About authors
- Postgraduate student Sankt-Peterburgskii gosudarstvennyi gornyi institut (tekhnicheskii universitet)
Abstract
The influence of the front clean up of stress-strain state around a vertical mine of a tectonically fracture massif for a uranium deposit «Antey» is considered. By means of computer simulation it’s have been confirmed by field observations.
Область исследования:
(Archived) Problems in geomechanics of technologeneous rock mass
References
- Galaev N.Z. Modelling of heading-and-stall method by a method of equivalent materials with application dynamometrical bases // Proceedings of the Leningrad Mining institute. 1961. Volume XLIV. P.24-32.
- Dordzhiev D. Simulation of the deformation mode forming around the stope ore in the field of tectonically fractured massif // Challenges and solutions in mineral industry. Freiberg. 2009. P.159-164.
Similar articles
Diagnostics of stability of a mine working in a protective pillar
2010 V. A. Smirnov, A. G. Olovyanny, B. N. Samorodov, A. V. Smirnova
Development of geothermal resources – higher efficiency in utilization of the earth’s interior
2010 E. I. Boguslavsky