Submit an Article
Become a reviewer
Vol 185
Pages:
152-157
Download volume:
RUS
Article

Calculation of supports of parallel workings divided with yieldable pillars at anthracite seams

Authors:
S. G. Stradanchenko1
N. V. Titov2
A. A. Privalov3
Yu. V. Turuk4
About authors
  • 1 — Ph.D., Dr.Sci. The Novocherkassk Polytechnical Institute
  • 2 — Ph.D., Dr.Sci. Professor The Novocherkassk Polytechnical Institute
  • 3 — Ph.D., Dr.Sci. Professor The Novocherkassk Polytechnical Institute
  • 4 — Ph.D. senior lecturer The Novocherkassk Polytechnical Institute
Date submitted:
2009-07-19
Date accepted:
2009-09-11
Date published:
2010-04-22

Abstract

The article presents the methods for calculation of supports of parallel workings divided with yieldable pillars at anthracite seams. Consideration is given to the development of experimental data card for protection and maintenance of paired conveyor entries with using the steelpolymer anchor supports.

Область исследования:
(Archived) Problems in geomechanics of technologeneous rock mass
Keywords:
rigid and yielding pillars relief holes advance workings rock movements type of support preset yielding of pillar
Funding:

None

Go to volume 185

References

  1. Titov N.V. Ways for higher efficiency of mining of thin and average-thichness of flat-lying anthracite seams / N.V.Titov, A.A. Privalov, Yu. V.Turuk. Rostov on Don: Publ. J.Izv.Sev.-Kavk. region, 2006. 196 р.
  2. Directions for the rational layout, protection and maintenance of mine workings at coal mines in the USSR / VNIMI. Leningrad, 1977. 211 p.
  3. Directions for the rational layout, protection and maintenance of mine workings at coal mines in the USSR / VNIMI. Leningrad, 1985. 222 p.

Similar articles

Account of stress gradients in rock mass in designing of mining constructions
2010 S. V. Suknyov, M. D. Novopashin
Monitoring of actual reserves as an instrument for higher assessment of cost of mining business under conditions of adaptation of russian assessments of reserves to international standards
2010 S. V. Shaklein
MINEFRAME is the modern tool for mining maintenance
2010 L. S. Lomako, G. G. Korol
Active methods for control of geomechanical state of rock mass in coal deposit mining under complicated geological-and-mining conditions
2010 F. N. Voskoboev, Yu. A. Semenov, V. A. Zvezdkin
The determination of the volume stress-strain conditions of the rock massive with the circular outline mining ensrined with the anchors
2010 A. G. Protosenya, N. A. Belyakov
Improved light-weight support types in mine workings
2010 V. A. Smirnov, A. E. Khlusov, B. N. Samorodov