Geomechanical problems in the forecast of stress-strain state of underground stations of the metro at a great depth
About authors
- 1 — Ph.D. Associate professor Saint Petersburg State Mining Institute (Technical University)
- 2 — Ph.D., Dr.Sci. Professor Saint Petersburg State Mining Institute (Technical University)
- 3 — Ph.D. Associate professor Saint Petersburg State Mining Institute (Technical University)
Abstract
Forecast of stress and strain state of deep underground metro stations is considered in this article. A complex approach to study of static work of the metro stations including the in situ testing at different stages of their construction and numerical modeling with finite element method is shown.
Область исследования:
(Archived) Problems in geomechanics of technologeneous rock mass
Keywords:
the metro station
loads
in-situ testing
column-run complexes. finite elements method
geomechanical forecast
Similar articles
Influence of rock disturbance on their rheological properties
2010 M. D. Ilyinov, Yu. M. Kartashov, A. T. Karmanskii, V. A. Kozlov
Calculation of supports of parallel workings divided with yieldable pillars at anthracite seams
2010 S. G. Stradanchenko, N. V. Titov, A. A. Privalov, Yu. V. Turuk
Simulation of the stress-strain state forming around the vertical mine in the field of tectonically fractured massif
2010 D. Yu. Dordzhiev
Preconditions for application of supports of different types in productive workings of low-thick gently-pitching deposits in tectonically stressed massif (for conditions of the Karnasurt ore mine)
2010 A. V. Lovchikov, A. V. Matytsyn