Diagnostics of stability of a mine working in a protective pillar

Authors:
V. A. Smirnov1
A. G. Olovyanny2
B. N. Samorodov3
A. V. Smirnova4
About authors
  • 1 — Ph.D. leading research assistant Saint Petersburg State Mining Institute (Technical University)
  • 2 — Ph.D. leading research assistant Saint Petersburg State Mining Institute (Technical University)
  • 3 — senior research assistant Saint Petersburg State Mining Institute (Technical University)
  • 4 — leading engineer Geomaster Co. Ltd.
Date submitted:
2009-07-03
Date accepted:
2009-09-05
Date published:
2010-04-22

Abstract

Consideration is given to the results of assessment of stability of the main transportation way of horizon of undercutting at the «Skalisty» ore mine of the Norilsk Co. – connecting slope. The mathematical modeling of the method for a working protection with a protective pillar has shown that this method will not ensure the stability of the mine working for the whole period of its exploitation. A new method was suggested for protection of the working with the use of preliminarily created stress relieving zone during formation of the packing massif.

Область исследования:
(Archived) Problems in geomechanics of technologeneous rock mass
Keywords:
rock mass transportation way the mathematical modeling
Go to volume 185

References

  1. Agoshkov M.I. Influence of packing of the minedout space on the carrying capacity of pillars/M.L.Agoshkov, A.L.Trebukov/The A.A. Skochinsky IGD. Moscow, 1963.
  2. Baranov A.O. Calculation of parameters of technological processes in underground mining of ore. Moscow: Nedra, 1985. 224 р.
  3. Ilstein AM. et al. Calculation methods for pillars and ceiling chambers at the ore deposits. Moscow: Nauka, 1964. 141 р.
  4. Kostyuchenko L.M. Determination of parameters of ore pillars in mining systems with packing. Methods of calculations/The A.A.Skochinsky IGD. Moscow, 1968. 19 р.
  5. Methodological directions for the determination of sizes of chambers and pillars in chamber mining systems of non-ferrous metal ores / VNIMI. Leningrad, 1972. 82 р.

Similar articles

Geomechanical problems in the forecast of stress-strain state of underground stations of the metro at a great depth
2010 P. A. Demenkov, I. E. Dolgiy, V. I. Ochkurov
The stress-strain state of the massive of the loose ores in the Yakovlevsky deposit around the minings which were drilled with the combines or with drilling-blast technology
2010 V. I. Ochkurov, V. Yu. Sinegubov, A. V. Streletskiy
Surveying methods for providing geodynamical safety of mining operations
2010 E. N. Kuznetsova
Results of repeated geodetic observations аt the Мukhanovsk technogenic geodynamic polygon
2010 A. G. Grunin, I. M. Zalyalov, O. D. Ivanchik, Yu. O. Kuzmin
Simulation of the stress-strain state forming around the vertical mine in the field of tectonically fractured massif
2010 D. Yu. Dordzhiev
Influence of geomechanical processes in rock mass on the selection of parameters of technological schemes for flat seams mining at the Leninsk-Kuznetsk coal deposit
2010 E. P. Yutiaev