Diagnostics of stability of a mine working in a protective pillar

Authors:
V. A. Smirnov1
A. G. Olovyannyi2
B. N. Samorodov3
A. V. Smirnova4
About authors
  • 1 — Saint Petersburg State Mining Institute (Technical University)
  • 2 — Saint Petersburg State Mining Institute (Technical University)
  • 3 — Saint Petersburg State Mining Institute (Technical University)
  • 4 — leading engineer
Date submitted:
2009-07-03
Date accepted:
2009-09-05
Date published:
2010-01-01

Abstract

Consideration is given to the results of assessment of stability of the main transportation way of horizon of undercutting at the «Skalisty» ore mine of the Norilsk Co. – connecting slope. The mathematical modeling of the method for a working protection with a protective pillar has shown that this method will not ensure the stability of the mine working for the whole period of its exploitation. A new method was suggested for protection of the working with the use of preliminarily created stress relieving zone during formation of the packing massif. 

Go to volume 185

References

  1. Агошков М.И. Влияние закладки выработанного пространства на несущую способность целиков / М.И.Агошков, А.Л.Требуков / ИГД им. А.А.Скочинского. М., 1963.
  2. Баранов А.О. Расчет параметров технологических процессов подземной добычи руд. М.: Недра, 1985. 224 с.
  3. Ильштейн А.М. и др. Методы расчета целиков и потолочин камер рудных месторождений. М.: Наука, 1964. 141 с.
  4. Костюченко Л.М. Определение параметров рудных целиков при системах разработки с закладкой. Методика расчета / ИГД им. А.А.Скочинского. М., 1968. 19 с.
  5. Методические указания по установлению размеров камер и целиков при камерных системах разработки руд цветных металлов / ВНИМИ. Л., 1972. 82 с.

Similar articles

Investigation of stress-strain state of floor of the dividing mass of deep-lying ore mines at Тalnakh
2010 V. A. Zvezdkin, B. Yu. Zuev, V. M. Klimkina, A. G. Anokhin, T. P. Darbinyan
Efficient assessment of stress state of coal seams liable to rock bursts
2010 F. P. Ivchenko, N. V. Krotov
Influence of geomechanical processes in rock mass on the selection of parameters of technological schemes for flat seams mining at the Leninsk-Kuznetsk coal deposit
2010 E. P. Yutyaev
The use of computer technologies аt the stages of prospecting, mining and conservation of mineral deposits
2010 K. V. Morozov, S. V. Lukichev
Simulation of the stress-strain state forming around the vertical mine in the field of tectonically fractured massif
2010 D. Yu. Dorzhiev
Cycles of the earth and sun – the important factor оf activity of geodynamic processes at coal- and ore mines
2010 A. N. Shabarov, B. G. Tarasov