Articles

Problems in geomechanics of technologeneous rock mass
  • Date submitted
    2009-07-03
  • Date accepted
    2009-09-05
  • Date published
    2010-01-01

Diagnostics of stability of a mine working in a protective pillar

Article preview

Consideration is given to the results of assessment of stability of the main transportation way of horizon of undercutting at the «Skalisty» ore mine of the Norilsk Co. – connecting slope. The mathematical modeling of the method for a working protection with a protective pillar has shown that this method will not ensure the stability of the mine working for the whole period of its exploitation. A new method was suggested for protection of the working with the use of preliminarily created stress relieving zone during formation of the packing massif.

How to cite: Smirnov V.A., Olovyanny A.G., Samorodov B.N., Smirnova A.V. Diagnostics of stability of a mine working in a protective pillar // Journal of Mining Institute. 2010. Vol. 185. p. 113-117.