Diagnostics of stability of a mine working in a protective pillar

Authors:
V. A. Smirnov1
A. G. Olovyanny2
B. N. Samorodov3
A. V. Smirnova4
About authors
  • 1 — Ph.D. leading research assistant Saint Petersburg State Mining Institute (Technical University)
  • 2 — Ph.D. leading research assistant Saint Petersburg State Mining Institute (Technical University)
  • 3 — senior research assistant Saint Petersburg State Mining Institute (Technical University)
  • 4 — leading engineer Geomaster Co. Ltd.
Date submitted:
2009-07-03
Date accepted:
2009-09-05
Date published:
2010-01-01

Abstract

Consideration is given to the results of assessment of stability of the main transportation way of horizon of undercutting at the «Skalisty» ore mine of the Norilsk Co. – connecting slope. The mathematical modeling of the method for a working protection with a protective pillar has shown that this method will not ensure the stability of the mine working for the whole period of its exploitation. A new method was suggested for protection of the working with the use of preliminarily created stress relieving zone during formation of the packing massif.

Keywords:
rock mass transportation way the mathematical modeling
Go to volume 185

References

  1. Агошков М.И. Влияние закладки выработанного пространства на несущую способность целиков / М.И.Агошков, А.Л.Требуков / ИГД им. А.А.Скочинского. М., 1963.
  2. Баранов А.О. Расчет параметров технологических процессов подземной добычи руд. М.: Недра, 1985. 224 с.
  3. Ильштейн А.М. и др. Методы расчета целиков и потолочин камер рудных месторождений. М.: Наука, 1964. 141 с.
  4. Костюченко Л.М. Определение параметров рудных целиков при системах разработки с закладкой. Методика расчета / ИГД им. А.А.Скочинского. М., 1968. 19 с.
  5. Методические указания по установлению размеров камер и целиков при камерных системах разработки руд цветных металлов / ВНИМИ. Л., 1972. 82 с.

Similar articles

Method of calculation stability of the open pit edges
2010 A. V. Chebakov
Investigation of stress-strain state of floor of the dividing mass of deep-lying ore mines at Тalnakh
2010 V. A. Zvezdkin, B. Yu. Zuev, V. M. Klimkina, A. G. Anokhin, T. P. Darbinyan
Account and movement of reserves in the information system of Silvinit co.
2010 A. V. Kataev, S. N. Kutovoi, E. M. Efimov, M. V. Gilev
Methods for presetting of artificial yielding to anthracite pillars
2010 S. G. Stradanchenko, N. V. Titov, Yu. V. Turuk
MINEFRAME is the modern tool for mining maintenance
2010 L. S. Lomako, G. G. Korol
Simulation of the stress-strain state forming around the vertical mine in the field of tectonically fractured massif
2010 D. Yu. Dordzhiev