Organization and conduct of monitoring of geodynamic processes at the Grushovaya transshipment oil base of the Chernomortransneft Co
Authors:
About authors
- Ph.D. leading research assistant Saint Petersburg State Mining Institute (Technical University)
Abstract
The complex of geophysical methods and equipments for continuous and periodic monitoring of the influence of present-day geodynamic processes on support and rocks along the route of technological tunnel of3300 mlong within the zone of high seismicity has been developed.
Область исследования:
(Archived) Problems in geomechanics of technologeneous rock mass
Funding:
None
Similar articles
Transformation of the form and angular parameters of rock movement processes with depth at ore deposits
2010 A. G. Shadrin, M. A. Shadrin
Numerical assessment of stress-strain field in vicinity of large open pit mine taking into account geomechanical, geological and mining factors
2010 A. A. Kozyrev, I. E. Semionova, V. V. Rybin, I. M. Avetisyan
Conceptual principles of mining company’s balanced development in condition of necessity of innovation transformation
2010 A. A. Gurev