Organization and conduct of monitoring of geodynamic processes at the Grushovaya transshipment oil base of the Chernomortransneft Co
Authors:
About authors
- Ph.D. leading research assistant Saint Petersburg State Mining Institute (Technical University)
Abstract
The complex of geophysical methods and equipments for continuous and periodic monitoring of the influence of present-day geodynamic processes on support and rocks along the route of technological tunnel of3300 mlong within the zone of high seismicity has been developed.
Область исследования:
(Archived) Problems in geomechanics of technologeneous rock mass
Similar articles
The use of data on stress-strain state of rock mass in solutions of mining-and-technical tasks on the example of the Tishin ore mine
2010 Yu. A. Kashnikov, S. G. Ashikhmin, D. V. Shustov, A. I. Ananin, A. E. Fandeev
Control of deformations of buildings and constructions at the built-up territories within mining diversions of oil and gas fields under conditions of Far North
2010 Yu. I. Kantemirov, Yu. B. Baranov, E. V. Kiselevskii, V. V. Bilyansky, S E. Nikiforov, V. G. Gryaznov, M. A. Bolsunovsky, Robert Lanzl
Preconditions for application of supports of different types in productive workings of low-thick gently-pitching deposits in tectonically stressed massif (for conditions of the Karnasurt ore mine)
2010 A. V. Lovchikov, A. V. Matytsyn