Stress-strain condition of the ore massive within the second working modeling
About authors
- 1 — Saint Petersburg State Mining Institute (Technical University)
- 2 — Saint Petersburg State Mining Institute (Technical University)
Abstract
According to geological data received on the Jakovlevsky deposit, the spatial geomechanical model has been developed.During the analysis of the is intense-deformed condition pictures of distribution of horizontal pressure and vertical displacement on border ore потолочины and карбоновой thicknesses have been received. It is established that the zone of clearing works essentially influences distribution of pressure and movings to border ore roof and carbonic thicknesses. By results of modeling it is possible to estimate possibility of formation of vertical water spending cracks in an ore roof.
Область исследования:
(Archived) Geomechanics, geodesy, mine surveying and cadastre
Similar articles
Assessment of alluvial gold-bearing raw materials from the permafrost zone for justification of combined geotechnology of gold heap leaching
2011 S. B. Tataurov
Mass-transfer and the crystallization stream at decomposition of aluminate solutions
2011 D. A. Kremcheeva, V. N. Brichkin
Revealing of the most significant factors of many-storeyed housing ground area cadastral cost estate of Northwest district small and average settlements
2011 O. Yu. Lepikhina
Improvement development of technology for processing electronic scrap concentrates
2011 T. A. Aleksandrova, A. N. Telyakov