Submit an Article
Become a reviewer
Vol 189
Pages:
23-26
Download volume:
RUS
Article

Amplitude-phase correction of additional MT impedance curves for two dimensional structures

Authors:
E. Yu. Ermolin
About authors
  • post-graduate student Saint Petersburg State Mining Institute (Technical University)
Date submitted:
2010-07-23
Date accepted:
2010-09-18
Date published:
2011-03-21

Abstract

The regularities of the amplitudes and phases connections of MT-impedance tensor components for 2D geoelectrical synthetic models have been considered. The amplitude-phase correction (APC) allows to improve the quality of data processing results both for the main and for the additional impedances. It also gives a possibility to suppress biased data for noise pollution data. Recommendations on accuracy rising of determination of tensor impedance components in the MT-data processing have been defined on the base of found regularities.

Область исследования:
(Archived) Geology and geophsics
Keywords:
MT sounding additional impedance data processing
Funding:

None

Go to volume 189

References

  1. Bezruk I.A. Evaluation of the impedance reliability in the processing of magnetotelluric variations / I.A.Bezruk,
  2. V.O.Lahtionov // Applied Geophysics. Moscow: Nedra. 1977. V.89. P.80-87.
  3. Beliavsky V.V. Technology of ore audimagnitotelluric sensing / V.V.Beliavsky, V.V.Sukhiy // Exploration and conservation of mineral resources. Moscow: Nedra, 2003. № 2. P.38-47.
  4. Vanyan L.L. Calculation of frequency sounding method phase curves by transformation method / L.L.Vanyan, A.A.Kaufman, E.I.Terekhin // Applied Geophysics. 1961.V.30. P. 103-114.
  5. Geoelectric prospecting. Geophysics guide. In two volumes / V.K.Khmelnitsky, V.M.Bondarenko. V.1, 2 ed., Revised and added. Moscow: Nedra, 1989. 291 p.
  6. Mark N. Berdichevsky. Models and Methods of Magnetotellurics / N.Mark, V.Berdichevsky, I.Dmitriev. Moscow: Scientific World, 2009. P. 69-78.

Similar articles

Assessment of alluvial gold-bearing raw materials from the permafrost zone for justification of combined geotechnology of gold heap leaching
2011 S. B. Tataurov
To the estimation of the rate of discounting for complex manufacture
2011 P. A. Zhigulevich
Main principles of design of the automated system and development of mathematical model of process electrolise
2011 E. Yu. Georgieva, Yu. V. Sharikov
Influence of action of underground waters on deformation of the open pit edges
2011 A. G. Protosenya, A. V. Chebakov
The control algorithm reagent conditions of flotation copper-nickel ores on the basis of оptimizing the ionic parameters
2011 A. M. Kurchukov
Selection of parameters camouflet blasting to reduce bump hazard by development uranium deposits
2011 D. Yu. Dordzhiev