Determination of the front mining length for backfill mining method of complex structure carbon deposits by railway transport

Authors:
V. V. Ivanov
About authors
  • Saint Petersburg State Mining Institute (Technical University)
Date submitted:
2010-08-14
Date accepted:
2010-10-22
Date published:
2011-02-01

Abstract

The work describes basic features of open pit development of complex structure carbon deposits. The rational length of excavator block for different models of dragline for backfill mining method was determined. The work also gives the dependence for determining the production front length for development of complex structure carbon deposits with the use of railway service for transportation of the extracted mineral.

Go to volume 190

References

  1. Арсентьев А.И. Развитие горных работ в карьерном пространстве / Санкт-Петербургский горный ин-т. 1994. 104 с.
  2. Арсентьев А.И. Проектирование горных работ при открытой разработке месторождений / А.И.Арсентьев, Г.А.Холодняков. М.: Недра, 1994. 336 с.
  3. Единые правила безопасности при разработке месторождений полезных ископаемых открытым способом. ПБ 03-498-02. М., 2003. 132 с.
  4. Иванов В.В. Определение оптимальной величины готовых к выемке запасов при открытой разработке сложноструктурных карбонатных месторождений // Освоение минеральных ресурсов Севера. Воркута, 2008. С.112-116.
  5. Ржевский В.В. Технология и комплексная механизация открытых горных работ. М.: Недра, 1968. 639 с.
  6. Чирков А.С. Добыча и переработка строительных горных пород, М.: Изд-во Московского государственного горного ун-та, 2001. 623 с.

Similar articles

Calculation moving and deformations used functions of typical curves, analytically expressed
2011 E. S. Rozhnov
Assessment of geodynamic and geomechanical conditions in the mining of ore bodies of near-ore bank reserves at the Koashva open-pit mine
2011 V. V. Zubkov, I. A. Zubkova, G. V. Leontev, A. G. Zileev
The field observation for the processes of settling of the ore ceiling caused by mining works at Yakovlevsky deposit
2011 A. G. Protosenya, D. N. Petrov, K. G. Sinyakin, G. A. Martemyanova
Exploitational problems of the kholodninskoye polimetallik deposit mining
2011 V. P. Zubov, O. V. Mikhailenko
Geomichanical justification of entries stability at development of nearboard reserves of Кoashva quarry with a roof fall of a disturbed pit wall
2011 Yu. N. Ogorodnikov, A. D. Kuranov
Technogenic transformation of the basic components of megacities underground space and its account in geomechanical calculations (on the example of Saint Petersburg)
2011 R. E. Dashko, A. V. Shidlovskaya, K. V. Pankratova, A. M. Zhukova