Determination of the front mining length for backfill mining method of complex structure carbon deposits by railway transport

Authors:
V. V. Ivanov
About authors
  • Saint Petersburg State Mining Institute (Technical University)
Date submitted:
2010-08-14
Date accepted:
2010-10-22
Date published:
2011-04-05

Abstract

The work describes basic features of open pit development of complex structure carbon deposits. The rational length of excavator block for different models of dragline for backfill mining method was determined. The work also gives the dependence for determining the production front length for development of complex structure carbon deposits with the use of railway service for transportation of the extracted mineral.

Область исследования:
(Archived) Geotechnology
Funding:

None

Go to volume 190

Similar articles

Stress and strain state of strata before and after drainage
2011 D. N. Petrov
Aspects of coal strata mining at the mine of the elegest deposit (the republic of Tyva)
2011 Yu. V. Gromov, D. N. Demekhin
Dynamics of rock pressure manifestation in mining the flat-lying coal seams with heavy roofs
2011 S. G. Baranov, D. S. Vlasenko, M. A. Loginov
The forecasting of stress condition in the «pillar-working» system in combined action of rock bump and geostatic pressure
2011 V. V. Karpenko, Yu. N. Ogorodnikov
Implementation of various failure criteria for numerical models of rock mass
2011 M. Yandris, P. A. Demenkov
Metrological maintenance mine surveying
2011 V. A. Golovanov, E. M. Volokhov, V. N. Gusev