Submit an Article
Become a reviewer
Vol 190
Pages:
46
Download volume:
RUS
Article

Determination of the front mining length for backfill mining method of complex structure carbon deposits by railway transport

Authors:
V. V. Ivanov
About authors
  • Saint Petersburg State Mining Institute (Technical University)
Date submitted:
2010-08-14
Date accepted:
2010-10-22
Date published:
2011-04-05

Abstract

The work describes basic features of open pit development of complex structure carbon deposits. The rational length of excavator block for different models of dragline for backfill mining method was determined. The work also gives the dependence for determining the production front length for development of complex structure carbon deposits with the use of railway service for transportation of the extracted mineral.

Область исследования:
(Archived) Geotechnology
Go to volume 190

Similar articles

Metrological maintenance mine surveying
2011 V. A. Golovanov, E. M. Volokhov, V. N. Gusev
Account of influence of fracturing of stony and semistony rocks on the strength of rock mass in evaluation of stability of open-pit slopes by prospecting data
2011 A. M. Mochalov, S. V. Kagermazova, G. A. Grebenshchikova
Foundation of Cholodninskoye deposit mining systems in conditions of ecological risks
2011 V. P. Zubov, O. V. Mikhailenko, A. A. Antonov, M. D. Morozov
A new technique for the determination of ultimate strength in extention of rocks
2011 V. A. Korshunov, Yu. M. Kartashov
Stabilization of development workings in overworked layers
2011 A. A. Sidorenko, S. A. Sidorenko, O. V. Trushko
Geomichanical justification of entries stability at development of nearboard reserves of Кoashva quarry with a roof fall of a disturbed pit wall
2011 Yu. N. Ogorodnikov, A. D. Kuranov