Determination of the front mining length for backfill mining method of complex structure carbon deposits by railway transport
Authors:
About authors
- Saint Petersburg State Mining Institute (Technical University)
Abstract
The work describes basic features of open pit development of complex structure carbon deposits. The rational length of excavator block for different models of dragline for backfill mining method was determined. The work also gives the dependence for determining the production front length for development of complex structure carbon deposits with the use of railway service for transportation of the extracted mineral.
Область исследования:
(Archived) Geotechnology
Funding:
None
Similar articles
Methods of the estimation of the condition of hydraulic engineering tunnels according to laser-scanning survey
2011 V. N. Gusev, E. M. Volokhov, V. A. Golovanov, I. P. Ivanov, M. Yu. Vasilev, V. K. Nosov, P. I. Yushmanov
Calculation moving and deformations used functions of typical curves, analytically expressed
2011 E. S. Rozhnov
Development of tecnological shemes of the selective extraction of the complex potash seams under conditions of the starobin deposit
2011 O. V. Kovalev, E. R. Kovalskii, Yu. G. Sirenko, I. Yu. Tkhorikov
Calculation of displacement and deformations of rocks tunnels arising at building taking into account vertical asymmetry in distribution of displacement
2011 E. M. Volokhov, N. S. Bakh