Determination of the front mining length for backfill mining method of complex structure carbon deposits by railway transport
Authors:
About authors
- Saint Petersburg State Mining Institute (Technical University)
Abstract
The work describes basic features of open pit development of complex structure carbon deposits. The rational length of excavator block for different models of dragline for backfill mining method was determined. The work also gives the dependence for determining the production front length for development of complex structure carbon deposits with the use of railway service for transportation of the extracted mineral.
Область исследования:
(Archived) Geotechnology
Similar articles
Mathematical modelling of geomechanical processes at the estimation of influence of building underground constructions in cities on the undermined rock mass
2011 E. M. Volokhov, D. A. Potemkin
Calculation of displacement and deformations of rocks tunnels arising at building taking into account vertical asymmetry in distribution of displacement
2011 E. M. Volokhov, N. S. Bakh
Management stress-strain state block structure partition arrays in difficult geological and mining engineering conditions of mine Тalnakh
2011 V. A. Zvezdkin, V. N. Karelin, A. G. Anokhin, Yu. N. Nagovitsin