Submit an Article
Become a reviewer
Vol 190
Pages:
46
Download volume:
RUS
Article

Determination of the front mining length for backfill mining method of complex structure carbon deposits by railway transport

Authors:
V. V. Ivanov
About authors
  • Saint Petersburg State Mining Institute (Technical University)
Date submitted:
2010-08-14
Date accepted:
2010-10-22
Date published:
2011-04-05

Abstract

The work describes basic features of open pit development of complex structure carbon deposits. The rational length of excavator block for different models of dragline for backfill mining method was determined. The work also gives the dependence for determining the production front length for development of complex structure carbon deposits with the use of railway service for transportation of the extracted mineral.

Область исследования:
(Archived) Geotechnology
Funding:

None

Go to volume 190

Similar articles

Stabilization of development workings in overworked layers
2011 A. A. Sidorenko, S. A. Sidorenko, O. V. Trushko
Justification of gold heap cryoleaching geotechnology
2011 S. B. Tataurov
Development of strains in uniform slopes with phased mining
2011 A. M. Mochalov, A. V. Chebakov
Development of tecnological shemes of the selective extraction of the complex potash seams under conditions of the starobin deposit
2011 O. V. Kovalev, E. R. Kovalskii, Yu. G. Sirenko, I. Yu. Tkhorikov
Geomichanical justification of entries stability at development of nearboard reserves of Кoashva quarry with a roof fall of a disturbed pit wall
2011 Yu. N. Ogorodnikov, A. D. Kuranov
Technology of kimberlitic tubes underquarry deposits mining in complex hydro-geological conditions
2011 M. N. Andreev, E. I. Boguslavskii