Determination of the front mining length for backfill mining method of complex structure carbon deposits by railway transport

Authors:
V. V. Ivanov
About authors
  • Saint Petersburg State Mining Institute (Technical University)
Date submitted:
2010-08-14
Date accepted:
2010-10-22
Date published:
2011-04-05

Abstract

The work describes basic features of open pit development of complex structure carbon deposits. The rational length of excavator block for different models of dragline for backfill mining method was determined. The work also gives the dependence for determining the production front length for development of complex structure carbon deposits with the use of railway service for transportation of the extracted mineral.

Область исследования:
(Archived) Geotechnology
Funding:

None

Go to volume 190

Similar articles

Determination of maximum roof spans in the intensive mining of flat-lying coal seams at the Kuzbass basin
2011 S. G. Baranov, D. S. Vlasenko, M. A. Loginov
Investigation of exfoliation height of roof rocks in mine workings within the zone of bearing pressure
2011 M. A. Rozenbaum, S. M. Chernyakhovskii, E. S. Savchenko
Approximate calculation of parameters of steelpolymer anchor in the support of stratified roof of the working on the principle of fastening layers together
2011 A. E. Khlusov, D. N. Demekhin
Management stress-strain state block structure partition arrays in difficult geological and mining engineering conditions of mine Тalnakh
2011 V. A. Zvezdkin, V. N. Karelin, A. G. Anokhin, Yu. N. Nagovitsin
Influence of a condition of a regional zone of a layer on the mechanism of occurrence of explosions of methane on collieries
2011 S. A. Tolstunov
Aspects of coal strata mining at the mine of the elegest deposit (the republic of Tyva)
2011 Yu. V. Gromov, D. N. Demekhin