Submit an Article
Become a reviewer
Vol 190
Pages:
46
Download volume:
RUS
Article

Determination of the front mining length for backfill mining method of complex structure carbon deposits by railway transport

Authors:
V. V. Ivanov
About authors
  • Saint Petersburg State Mining Institute (Technical University)
Date submitted:
2010-08-14
Date accepted:
2010-10-22
Date published:
2011-04-05

Abstract

The work describes basic features of open pit development of complex structure carbon deposits. The rational length of excavator block for different models of dragline for backfill mining method was determined. The work also gives the dependence for determining the production front length for development of complex structure carbon deposits with the use of railway service for transportation of the extracted mineral.

Область исследования:
(Archived) Geotechnology
Go to volume 190

Similar articles

Subsidence and deformations of layers of the massif of rocks with formation of technogenic water spending cracks
2011 V. N. Gusev, E. S. Rozhnov
Metrological maintenance mine surveying
2011 V. A. Golovanov, E. M. Volokhov, V. N. Gusev
Assessment of safety factor for analysis of stability of boards of open-cast mines
2011 V. V. Zubkov, I. A. Zubkova
Geobiological and hydrogeochemical impact on underground escalator tunnel constructions determining intensification of corrosion material processes in Saint Petersburg
2011 D. Yu. Vlasov, A. V. Shidlovskaya, O. Yu. Aleksandrova
Substantiation of rational mining parameters for iv potash horizon of the starobin potash deposit
2011 O. V. Kovalev, S. P. Mozer, I. Yu. Mozer, A. V. Leisle
Technology of «cold» briquetting of rich ores of the Jakovlevsky deposit
2011 V. L. Trushko, R. E. Dashko, V. B. Kuskov, A. S. Klyamko