The simulation modelling in deposit project development analysis on the base of Shaidomskoe building stone deposit, «Amphibolithoviy» mining field
About authors
- 1 — Ph.D., Dr.Sci. professor Saint Petersburg State Mining University
- 2 — post-graduate student Saint Petersburg State Mining University
Abstract
The article covers the approach to the development project probabilistic estimation of building stone deposit. The approach is based on the Monte-Carlo simulation modelling of its efficiency indicators. Also the correlation and statistical analysis of simulation are conducted.
Область исследования:
(Archived) Economical problems in use of subsurface and development of the mineral resources complex
Funding:
None
References
- Ampilov Y.P., Gert A.A. Economic geology. Мoscow, 2006. 409 p.
- Astahov A.S., Goldman E.L. Economics for geologists and economists. Мoscow, 2007. 328 p.
- Vadzinsky R. Statistical computation in MS Excel. Saint Petersburg, 2008. 608 p.
- Mamiy E.A., Baiburtian M.A. Approach to the development of risk analysis method. URL: http://www.cfin.ru/finanalysis/risk/innovative.shtml
- Sobol I.M. Monte-Carlo method. Мoscow, 1978 . 64 р.
Similar articles
Regional forecasting and metallogenic studies of uranium and their role in the formation of the mineral resource base of nuclear industry in Russia
2011 A. A. Smislov, A. V. Kozlov
Methodical approaches to the economical estimation of CO2 – enhanced oil recovery projects
2011 A. E. Cherepovitsyn, O. A. Marinina
Problems of improvement of innovation management at the enterprises of fuel and energy complex
2011 E. G. Katysheva
Complex substantiation of ways to maintenan stability of local development excavations
2011 S. A. Sidorenko, A. A. Sidorenko