Submit an Article
Become a reviewer
Vol 194
Pages:
240
Download volume:

The simulation modelling in deposit project development analysis on the base of Shaidomskoe building stone deposit, «Amphibolithoviy» mining field

Authors:
Yu. P. Grigorev1
E. V. Shevchenko2
About authors
  • 1 — Saint Petersburg State Mining University
  • 2 — Saint Petersburg State Mining University
Date submitted:
2010-12-10
Date accepted:
2011-02-03
Date published:
2011-06-01

Abstract

The article covers the approach to the development project probabilistic estimation of building stone deposit. The approach is based on the Monte-Carlo simulation modelling of its efficiency indicators. Also the correlation and statistical analysis of simulation are conducted.

Go to volume 194

References

  1. Ампилов Ю.П. Экономическая геология / Ю.П.Ампилов, А.А.Герт. М., 2006. 409 с.
  2. Астахов А.С. Экономика для геологов и горняков / А.С.Астахов, Е.Л.Гольдман. М., 2007. 328 с.
  3. Вадзинский Р. Статистические вычисления в среде Excel. СПб, 2008. 608 с.
  4. Мамий Е.А. Подходы к совершенствованию методики анализа рисков / Е.А.Мамий, М.А.Байбуртян. http://www.cfin.ru/finanalysis/risk/innovative.shtml
  5. Соболь И.М. Метод Монте-Карло. М., 1978. 64 с.

Similar articles

The pegmatite fields structures
2011 Yu. V. Lir, D. V. Nikitin, A. Ya. Tutakova
Overview of the main risks of the enterprises of mining and metallurgical branches in modern conditions
2011 A. Yu. Tsvetkova
Methodical approaches to the economical estimation of CO2 – enhanced oil recovery projects
2011 A. E. Cherepovitsyn, O. A. Marinina
Complex substantiation of ways to maintenan stability of local development excavations
2011 S. A. Sidorenko, A. A. Sidorenko
Strategic estimation of major investment projects of the mining companies
2011 T. V. Ponomarenko, O. I. Tsarakov
New helicopter-borne time-domain airborne electromagnetic «Equator» system
2011 A. K. Volkovitskii, E. V. Karshakov, E. V. Moilanen