Results of application of differentially normalized electrical metod on diagonal area of Caspian sea shelf

Authors:
E. O. Kudryavtseva
About authors
  • post-graduate student Saint Petersburg State Mining University
Date submitted:
2010-12-03
Date accepted:
2011-02-07
Date published:
2011-12-30

Abstract

The IP anomaly is fixed on the Diagonal area by differentially normalized electrical metod (DNME). The detailed modeling research were carried out after reception of negative results of drilling. Pyrite presence was marked in this borehole. The relaxation time is study. It was determined that in the vicinity of the borehole exceeds too much this parameter which was received within the limits of anomalies above known hydrocarbon deposits. It is supposed, that the distinction is caused by features of polarizing processes. The relaxation time should be increased, if a pyrite surface is oxidized, i.e. provided that reducing environment will change on oxidizing. By results of researches it was concluded, that the most probable reason of IP anomaly formation in borehole area is epigene pyrite, arisen under influence of pre-existing here and later destroyed deposit.

Область исследования:
(Archived) Application of the modern geophysical technologies for prospecting and exploration of mineral deposits
Keywords:
pyrite hydrocarbon relaxation time Diagonal area
Go to volume 194

Similar articles

Reactive power compensation optimization and its optimization in the electrical network complex
2011 Ya. E. Shklyarskii, I. Gonsales Palau
Methodological approaches to the economic evaluation of anthropological deposits
2011 O. S. Krasnov, V. A. Salikhov
Ore-forming metamorphism and natural types of gold-bearing ores
2011 A. P. Vakhrusheva, S. V. Sendek
Application of inphase response component by low-frequency airborne electroprospecting EM-4H system
2011 A. K. Volkovitskii, E. V. Karshakov, E. V. Moilanen
Technology and management of yakutian kimberlitic tubes underquarry deposits mining at difficlult hydrogeological conditions
2011 Vladimir S. Litvinenko, E. I. Boguslavskii, M. N. Andreev
Strategic estimation of major investment projects of the mining companies
2011 T. V. Ponomarenko, O. I. Tsarakov