Submit an Article
Become a reviewer
Vol 195
Pages:
277-280
Download volume:
RUS
Article

Automatic adjustment of metrology performance meter random signal transducer analyzer liquid flows

Authors:
R. M. Proskuryakov1
A. V. Kopteva2
I. N. Voityuk3
About authors
  • 1 — Ph.D., Dr.Sci. professor Saint Petersburg State Mining University
  • 2 — post-graduate student Saint Petersburg State Mining University
  • 3 — post-graduate student Saint Petersburg State Mining University
Date submitted:
2011-07-19
Date accepted:
2011-09-12
Date published:
2012-04-05

Abstract

New way of statistical pulsation measurements by radioisotope technique is described, being alternative to the existing stream control methods and allowing to improve accuracy of measurements. The basic formula fundamental for the method of calibration characteristics correction is shown.

Область исследования:
(Archived) Mining electromechanics and mining equipment
Keywords:
multiphase multicomponent stationary non-stationary the converter metrological radio isotope a component non-contact flow
Go to volume 195

References

  1. Averinа T.А., Artemiev S.S. Analysis of the accuracy of Monte Carlo methods for solving boundary value problems by means of the probabilistic representation of // Siberian Journal of Computer Science. 2008. Vоl. 11. N 3. P. 239-250.
  2. Gazin D.I., Kratirov V.A. The problem of detecting free gas in the tank oil and ways to solve // Microprocessor instrument: Proceeding of the Saint-Petersburg State Polytechnic University. 2003. Iss. 3. P.48-54.
  3. Gusev N.G. The gamma radiation from radioactive isotopes and fission products. Theory and tables. Moscow, 1958. 233 p

Similar articles

Study of the ways saving to energy at transport of the oils
2012 S. V. Samolenkov, O. V. Kabanov
Mechanism of real option for the assessment оf risks of the investment project of offshore gas fields development
2012 M. N. Kruk
Environmental monitoring of the north ecosystems exposed to an impact of the mining
2012 A. V. Strizhenok
Mining complexes dismantling technologies at extraction of flat-lying thick coal seams with unstable rocks of the roof
2012 G. N. Karpov
Prospective ways of diamondiferous rock enrichment wastes utilization at M.V.Lomonosov diamond deposit
2012 A. Yu. Oblitsov, V. A. Rogalev
Determining the mine working height for the development of tailing dumps hydraulic excavator backdigger
2012 G. A. Kholodnyakov, K. R. Argimbaev, S. P. Reshetnyak