Submit an Article
Become a reviewer
Vol 195
Pages:
156
Download volume:

The technology analasys a problems оf utilization of bio- and oil slugge on enterprises fuel and energy complex

Authors:
K. A. Moiseeva1
V. A. Rogalev2
About authors
  • 1 — Saint Petersburg State Mining University
  • 2 — International Academy of Ecology, Man and Nature
Date submitted:
2011-07-20
Date accepted:
2011-09-06
Date published:
2012-01-01

Abstract

The paper deal with the problem of developing a rational technology of slime and silt recycling for company «KINEF», which nowadays is one of the leading companies in Russia in it area. Therefore the question of soil-waste utilization is one of the major issues to adress for this organisation. During the reaserch samples of soil waste were taken and analyised, which helped to work out a complite technology of recycling. The technology of processing based on methods «wet chemistry» and hydrometallurgical processes. Special attention is paid to the necessity of extrac- tion of the useful components.

Go to volume 195

References

  1. Зыкова И.В. Обезвреживание избыточных активных илов / И.В.Зыкова, Т.Г.Макашова, В.П.Панов // Экология и промышленность России. 2002. № 12. С.63-68.
  2. Пашкевич М.А. Методы оценки риска загрязнения природных вод в районах хранилищ производства // Горный информационно-аналитический бюллетень. 1999. № 1. С.147-150.
  3. Росляков П.В. О выборе оптимальной технологии термической переработки твердых бытовых отходов / П.В.Росляков, М.А.Изюмов, В.А.Кохненко // Энергетик. 1996. № 9. С.6-11.

Similar articles

The analysis of the current state and ways to improve the effectiveness of the Russian mineral resource base reproduction
2012 V. S. Khloponina
Geomechanical substantiation of stability of the tunnel’s face which situated in the proterozoic clay’s
2012 V. L. Trushko, A. N. Shokov
Different approaches of assigning the danger range of slime and silt from oil refinery biological treatment unit
2012 K. A. Moiseeva
Control of gasevolutioncoal-beds – the key factor of creation of safe working conditions
2012 I. V. Kurta
Ore reclaiming process flowsheets for the cyclical and continuous method of open-cast mining
2012 G. A. Kholodnyakov, A. O. Ipatova, D. A. Ikonnikov, K. R. Argimbaev
Hydro-geological monitoring on the Jakovlevsky mine as implement of increase safety conducting mine second working in difficult mine-geological conditions
2012 R. E. Dashko, E. N. Kovaleva