Design of tunnel lining of main line tunnels based on the evaluation of stress distribution patterns in tunnel lining

Authors:
A. G. Protosenya1
V. L. Trushko2
M. A. Karasev3
D. V. Sidorov4
About authors
  • 1 — Ph.D., Dr.Sci. professor Saint Petersburg State Mining University
  • 2 — Ph.D., Dr.Sci. professor Saint Petersburg State Mining University
  • 3 — Ph.D. associate professor Saint Petersburg State Mining University
  • 4 — Ph.D. head of the chair Saint Petersburg State Mining University
Date submitted:
2011-07-26
Date accepted:
2011-09-12
Date published:
2012-04-05

Abstract

Comparison of results of calculations of the tangential stresses on the inner contour of tunnel lining and radial stresses on the outer contour is done. Stresses are found by solving the problem of interaction in geomechanical system «lining-ground massif» in 2D and 3D model (single layer tunnel lining and double layer tunnel lining). Area of correct application of 2D models are revealed.

Область исследования:
(Archived) Topical issues in mining of ore and nonmetallic minerals
Keywords:
tunnel lining tubing stress problem statement plain strain tube interaction
Funding:

None

Go to volume 195

References

  1. Bulichev N.S., Amusin B.Z., Olovany A.G. Structural lining design of underground structures. Moscow, 1974. 320 p.
  2. Karasev M.A. Experimental observation and numerical simulation of tunnel lining located at different geological condition of Saint-Petersburg Metro // Innovations in Geoscience, geoengineering / Freiberger Technische Universitat Bergakademie. Freiberg, 2008. P. 272-280.
  3. Protosena A.G., Karasev M.A., Petrov D.N. Structural design of tunnel lining based on 3D numerical modeling // Subway and Tunnels (Tunneling association of Russia). 2008. N 4. P. 23-26.
  4. Protosena A.G., Karasev M.A. Stress and strain state of tunnel tubing lining based on 3d numerical modeling. Development of mineral resource: problems and solutions: 5-th international practical conference. Vorkuta, 2007. P. 45-49

Similar articles

Determination of the rate of bunker filling screw executive authority and power to cut costs
2012 E. A. Kremcheev, A. V. Bolshunov, D. O. Nagornov
Specificity technological scheme development of the stocks on mine «Yakovlevsky»
2012 A. A. Antonov, M. D. Morozov, A. S. Malyutin
Geomechanical substantiation of stability of the tunnel’s face which situated in the proterozoic clay’s
2012 V. L. Trushko, A. N. Shokov
Control of gasevolutioncoal-beds – the key factor of creation of safe working conditions
2012 I. V. Kurta
Incentive resource conservation measures for underground gas storage facilities
2012 G. S. Elizarova
Ore reclaiming process flowsheets for the cyclical and continuous method of open-cast mining
2012 G. A. Kholodnyakov, A. O. Ipatova, D. A. Ikonnikov, K. R. Argimbaev