Design of tunnel lining of main line tunnels based on the evaluation of stress distribution patterns in tunnel lining

Authors:
A. G. Protosenya1
V. L. Trushko2
M. A. Karasev3
D. V. Sidorov4
About authors
  • 1 — Saint Petersburg State Mining University
  • 2 — Saint Petersburg State Mining University
  • 3 — Saint Petersburg State Mining University
  • 4 — Saint Petersburg State Mining University
Date submitted:
2011-07-26
Date accepted:
2011-09-12
Date published:
2012-01-01

Abstract

Comparison of results of calculations of the tangential stresses on the inner contour of tunnel lining and radial stresses on the outer contour is done. Stresses are found by solving the problem of interaction in geomechanical system «lining-ground massif» in 2D and 3D model (single layer tunnel lining and double layer tunnel lining). Area of correct application of 2D models are revealed.

Go to volume 195

References

  1. Булычев Н.С. Расчет крепи капитальных горных выработок / Н.С.Булычев, Б.З.Амусин, А.Г.Оловянный. М.: Недра, 1974. 320 с.
  2. Карасев М.А. Натурные обследования тоннелей Санкт-Петербургского метрополитена и результаты численного моделирования напряженно-деформированного состояния тюбинговой обделки // Инновации в геонауке и геоинженерии / Фрайбергская горная академия, Фрайберг. 2008. С.272-280.
  3. Протосеня А.Г. Пространственное напряженно- деформированное состояние и оценка прочности тюбинговой обделки тоннелей // Метро и тоннели (Тоннельная ассоциация России). 2008. № 4. С. 23-26.
  4. Протосеня А.Г. Расчет напряженно-деформированного состояния тюбинговых крепей и обделок на основе пространственных моделей / А.Г.Протосеня, М.А.Карасев // Освоение минеральных ресурсов Севера: проблемы и решения: Тр. 5-й Межрегион. практ. конф. Воркута, 2007. С. 45-49.

Similar articles

Hydro-geological monitoring on the Jakovlevsky mine as implement of increase safety conducting mine second working in difficult mine-geological conditions
2012 R. E. Dashko, E. N. Kovaleva
Results of researches and trial introduction of plasma-pulse action technology on deposits of Russia
2012 A. A. Molchanov, A. V. Maksyutin, R. R. Khusainov
Automatic adjustment of metrology performance meter random signal transducer analyzer liquid flows
2012 R. M. Proskuryakov, A. V. Kopteva, I. N. Voityuk
Rationale for choice of technological schemes of producing aggregates by open-cast mine with mobile crushing and grading complex
2012 V. V. Ivanov, A. A. Faul, A. N. Kuznetsov
Mining complexes dismantling technologies at extraction of flat-lying thick coal seams with unstable rocks of the roof
2012 G. N. Karpov
Mechanism of real option for the assessment оf risks of the investment project of offshore gas fields development
2012 M. N. Kruk