Application of digital levels for rainall structures monitoring
Authors:
About authors
- student Saint Petersburg State Mining University
Abstract
Due to the ever-increasing housing density and increased demands on outdated municipal communications, which often forces the builders to work on updating and expanding the network of underground facilities in areas where it is imperative to ensure a minimal impact on the earth's surface. The study examined possible methods for reducing time and material resources to carry out observations of the settling of the objects in the construction zone.
Область исследования:
(Archived) Geodesy, geomechanics and underground construction
Funding:
None
References
- Kolesnikov G.V. Leveling rods coding techniques. Novosibirsk, 2009.
Similar articles
Synergetic effect of surface-modified powders of aluminium and its manifestation in tribology
2012 A. G. Syrkov, T. G. Kamalova, E. V. Remzova
Investment attractiveness of mining chemical companies as a factor of their competitiveness
2012 N. E. Chebaeva, T. V. Ponomarenko
Evaluation fineness gold ore from dunite with the use laboratory concentrator Nelson and laboratory mikropaner
2012 M. L. L. Diakite
Determination basic parameters backwall electro-parogeneratora for thermal influences on prizaboynuyu area layers withvvn
2012 N. S. Gubar