Application of digital levels for rainall structures monitoring
Authors:
About authors
- student Saint Petersburg State Mining University
Abstract
Due to the ever-increasing housing density and increased demands on outdated municipal communications, which often forces the builders to work on updating and expanding the network of underground facilities in areas where it is imperative to ensure a minimal impact on the earth's surface. The study examined possible methods for reducing time and material resources to carry out observations of the settling of the objects in the construction zone.
Область исследования:
(Archived) Geodesy, geomechanics and underground construction
Funding:
None
References
- Kolesnikov G.V. Leveling rods coding techniques. Novosibirsk, 2009.
Similar articles
Measurement of reactive power in electric circuits with hight harmonics
2012 Yu. E. Bunteev, A. K. Radkovskiy, V. A. Kuznetsov
Control of the condition of the rock-mass condition using tansducers of hydrostatie pressure during mining escalator tunnel of «Admiralteiskaya» underground station
2012 Yu. A. Norvatov, K. E. Volodchenko, M. V. Sergutin
Substantiation of the variant of the best and most the effective use of the ground area оf the Vasileostrovsky region of the city of Saint Petersburg
2012 E. N. Bykova, Yu. S. Morozova