Design features of diamond crowns for drilling of breeds with cracks rocks

Authors:
V. G. Gorelikov
About authors
  • Ph.D., Dr.Sci. professor National Mineral Resources University (University of Mines)
Date submitted:
2011-09-05
Date accepted:
2011-11-08
Date published:
2012-05-25

Abstract

The analysis of design data of diamond crowns is made. Feature of work of diamond crowns is noted at drilling of rocks, principal views of deterioration of diamonds and a matrix. Are given rekomendatsi on perfection of diamond crowns.

Область исследования:
(Archived) Present-day problems of geological exploration and well drilling
Keywords:
the analysis diamond a matrix a diamond crown channels a chisel trifle deterioration
Go to volume 197

References

  1. Bashkatov D.N. Research of influence of a mode of washing on process of formation of facets on diamond im-pregn irova nny Crowns / D.N.Bashkatov, C.K.Kudaykulov // Application of synthetic diamonds in drilling. Saint Petersburg , 1992. P.81- 85.
  2. Isonkin A.M. Influence of the size of sectors of a crown on indicators of its working capacity / A.M.Isonkin's, R.K. Bogdanov // Scientific and technical achievements and best practices in area of geology and investigation of a sub-soil . Мoscow, 1992. Vol .11. P .45- 48.
  3. Kochkarev A.V. Modern idea of the mechanism of self -jamming of a core / A.V.Kochkarev, D.N.Bashkatov. Мoscow, 1987.
  4. Mpezo Mavambo. Research of influence of design data of a diamond crown on its working capacity // Notesof Mi ning Institute. Saint Petersburg, 2002. Vol .152. P. 133- 134.
  5. Ponomarev P.P. Diamond drilling of treshchinovaty breeds. Leningrad, 1985.
  6. Chikhotkin Z.F. Influence of design features of the flushing channel of an impregnirovanny crown on destruction of rocks / Z.F.Chikhotkin, R.K.Bogdanov, A.P.Zakora // Improvement of equipment and technology of drilling of wells on firm minerals: Notes of mining institution UGTTТА . Yekaterinburg, 1996. Vol .19. P .68-78

Similar articles

Engineering-geological and geoecological principals of development activities for geological environment protection at underground construction
2012 I. P. Ivanov
Stress state of entries support when stocks of ore mine Vostochny are developing by combined open-pit and underground method
2012 A. G. Protosenya, A. D. Kuranov
Deep open pit walls design using rock mass stress-strained state
2012 S. P. Reshetnyak, Yu. V. Fedotova, S. N. Savchenko
Anticipating of probable strains slope of coal strip mine «Chernigovets» at seismically impact
2012 A. N. Shabarov, S. V. Tsirel, B. Yu. Zuev, A. A. Pavlovich
Industrial scale influence on formation оf the structure and the development strategy of the company
2012 A. M. Makovskii, A. N. Gavrilov, M. M. Khaikin
Acceptable risk assessment of production in mining industry
2012 A. N. Shabarov, G. I. Korshunov, E. G. Buldakova, Z. N. Cherkai