Submit an Article
Become a reviewer
Vol 199
Pages:
375
Download volume:

Development of the weighted biopolimer drilling mud for workover

Authors:
Vladimir S. Litvinenko1
N. I. Nikolaev2
About authors
Date submitted:
2011-11-15
Date accepted:
2012-01-23
Date published:
2012-05-01

Abstract

The results of research are related, with effective composition of process fluids for oil and gas workover.

Go to volume 199

Similar articles

Building of underground construction protected enclosing wall and method of displacement forecast of the soil
2012 M. G. Popov, S. V. Stepanenko
Creation of the geodetic marking network fixed by reflective sheet
2012 D. A. Afonin
Perspectives of further development of technics and technology of shafts building in Russia with consideration of world technologies
2012 V. A. Kurnakov, M. S. Pleshakov
Prediction of the mine working stability in the massif which are crossing zone of weakening
2012 M. G. Popov
Historical analysis of the system of estimation and expert’s examination of explored ore reserves in Russia
2012 A. V. Kozlov, V. A. Stepanov, I. G. Kiryakova, A. N. Evdokimov
Безопасные параметры сдвижения земной поверхности при строительстве метрополитена в Санкт-Петербурге
2012 V. P. Khutskii