Analysis of existing design procedures pumping mode LPG natural gas pipeline
About authors
- 1 — Ph.D., Dr.Sci. professor National Mineral Resources University (Mining University)
- 2 — Ph.D., Dr.Sci. professor National Mineral Resources University (Mining University)
- 3 — Ph.D. associate professor National Mineral Resources University (Mining University)
Abstract
The paper discusses possible ways of transporting liquefied natural gas (LNG), compares the estimated capital cost of the projects on marine and pipeline transportation of LNG and argues for the economic efficiency of LNG transfer pipelines. The authors offered the most likely options pipelines and LNG method of calculation of hydraulic parameters.
Область исследования:
(Archived) Geotechnology for development of liquid and gas mining fields
Keywords:
liquefied natural gas (LNG)
energy
LNG plant
ships to transport LNG
LNG receiving terminal
pipeline LNG
«cold pipe»
nonisothermal pipeline
multiphase flow
References
- Barmin I.V., Kunis I.D. Liquefied natural gas yesterday, today and tomorrow. Moscow, 2009.
- Vovk B.C., Nikitin B.A. Large-scale liquefied naturalgas: A manual for schools. Moscow, 2011.
- Rachevsky B.S. Liquefied petroleum gas. Moscow,2009.
- Tugunov P.I. Model calculations for the design andoperation of oil storage facilities and oil pipelines: A manual for schools. Ufa, 2002.
Similar articles
Formation of stressed state in temporary tunnel support when constructing a traffic tunnel of north caucasus railway near the slope
2012 M. O. Lebedev
Valuation of sustainable of pit wall based on data of digital photography of outcrop surfaces
2012 M. G. Mustafin, A. P. Sannikova
Determination of the stress parameters of nearbord areas of open pits, located in highly stressed rock massif
2012 A. D. Kuranov