The way of pipeline construction in areas of high seismic activity

Authors:
A. K. Nikolaev1
V. P. Dokukin2
O. F. Putikov3
About authors
  • 1 — Ph.D., Dr.Sci. professor National Mineral Resources University (Mining University)
  • 2 — Ph.D., Dr.Sci. professor National Mineral Resources University (Mining University)
  • 3 — Ph.D., Dr.Sci. professor National Mineral Resources University (Mining University)
Date submitted:
2011-11-11
Date accepted:
2012-01-16
Date published:
2012-12-29

Abstract

The way of pipeline construction in areas of high seismic activity. Plates, which located on the ground surface and fixed in the ground by means of four supports, are used to compensate for the seismic loads. On each shoulder by a hinge to rotate in a vertical plane passing through the longitudinal axis of the pipe installed two-arm lever, one arm of which is oriented perpendicular to the longitudinal axis, and its hinged to tie attached to it, and the second arm is oriented at a right angle to the shoulder is directed along the axis of the pipeline and is pivotally connected to the rod.

Область исследования:
(Archived) Geotechnology for development of liquid and gas mining fields
Keywords:
gas pipeline oil pipeline pipeline
Go to volume 199

References

  1. Nikolaev A.K. Hydrotransport in difficult climatic conditions. Saint Petersburg, 2004.
  2. Savinov O.A. Seismic resistance of main pipelinesand plant facilities in oil and gas industry. Moscow, 1980.
  3. Pat. 2250409 РФ. Method of laying undergroundpipeline in seismic zones / Kh.K.Mukhametdinov. Publ. 20.04.2005. N 11.
  4. Pat. 2453755 РФ. Method of laying underground pipeline in areas of high seismic activity / Y.D.Tarasov, A.K.Nikolaev, S.I.Chervonny, K.V.Bykov. Publ. 20.06.2012. N 17.

Similar articles

Methodology of the complex estimation of influence of tectonic disturbances on stability of the rock mass at mining of rock-bump hazardous ore deposits difficult geologic structure
2012 D. V. Sidorov
Formation of stressed state in temporary tunnel support when constructing a traffic tunnel of north caucasus railway near the slope
2012 M. O. Lebedev
Dynamics in change of stresses in hardly-caving roof and in a supported zone in the course of evolution of structural parameters of rock mass with secondary subsidence
2012 B. Yu. Zuev
Algorithm and characterization program of downhole electrosteamgenerator for heat treatment on high viscosity oil recervoirs
2012 E .A. Zagrivnyi, V. O. Zyrin
Substantiating of plasma-pulse technology use to increase oil recovery on high-viscosity oil fields
2012 A. A. Molchanov, I. E. Dolgii, A. V. Kozlov
Prediction of high speed railway tunnel induced settlement on the Sants – La Sagrera area (Barcelona)
2012 M. A. Karasev