The way of pipeline construction in areas of high seismic activity

Authors:
A. K. Nikolaev1
V. P. Dokukin2
O. F. Putikov3
About authors
  • 1 — Ph.D., Dr.Sci. professor National Mineral Resources University (Mining University)
  • 2 — Ph.D., Dr.Sci. professor National Mineral Resources University (Mining University)
  • 3 — Ph.D., Dr.Sci. professor National Mineral Resources University (Mining University)
Date submitted:
2011-11-11
Date accepted:
2012-01-16
Date published:
2012-12-29

Abstract

The way of pipeline construction in areas of high seismic activity. Plates, which located on the ground surface and fixed in the ground by means of four supports, are used to compensate for the seismic loads. On each shoulder by a hinge to rotate in a vertical plane passing through the longitudinal axis of the pipe installed two-arm lever, one arm of which is oriented perpendicular to the longitudinal axis, and its hinged to tie attached to it, and the second arm is oriented at a right angle to the shoulder is directed along the axis of the pipeline and is pivotally connected to the rod.

Область исследования:
(Archived) Geotechnology for development of liquid and gas mining fields
Keywords:
gas pipeline oil pipeline pipeline
Go to volume 199

References

  1. Nikolaev A.K. Hydrotransport in difficult climatic conditions. Saint Petersburg, 2004.
  2. Savinov O.A. Seismic resistance of main pipelinesand plant facilities in oil and gas industry. Moscow, 1980.
  3. Pat. 2250409 РФ. Method of laying undergroundpipeline in seismic zones / Kh.K.Mukhametdinov. Publ. 20.04.2005. N 11.
  4. Pat. 2453755 РФ. Method of laying underground pipeline in areas of high seismic activity / Y.D.Tarasov, A.K.Nikolaev, S.I.Chervonny, K.V.Bykov. Publ. 20.06.2012. N 17.

Similar articles

Multifunctional underground facility comprises a subway transferring node
2012 P. A. Demenkov
Безопасные параметры сдвижения земной поверхности при строительстве метрополитена в Санкт-Петербурге
2012 V. P. Khutskii
Prediction of the mine working stability in the massif which are crossing zone of weakening
2012 M. G. Popov
Use of hydrogeomechanical monitoring during shielding tunnel for underground station оf Saint Petersburg subway «Admiralteiskaya»
2012 Yu. A. Norvatov, I. B. Petrova, M. V. Sergutin
Using of laser scanning survey of barrow for deformation monitoring
2012 A. V. Kovyazin
Building of construction pit and investigation of displacement wall of the secant pile
2012 S. V. Stepanenko