Submit an Article
Become a reviewer
Vol 199
Pages:
118
Download volume:

Multifunctional underground facility comprises a subway transferring node

Authors:
P. A. Demenkov
About authors
  • National Mineral Resources University (Mining University)
Date submitted:
2011-11-02
Date accepted:
2012-01-17
Date published:
2012-05-01

Abstract

Structural spatial concept of subway transferring node for two, three andfour metro lines, which are located in unified underground facility issuggested. Preliminary structural fem design of underground facility isdone. Different construction methods are considered and step by step excavation isincluded in finite element  modeling.

Go to volume 199

References

  1. Деменков П.А. Анализ напряженно-деформированного состояния обделки опускного колодца многофункционального подземного комплекса / П.А.Деменков, М.А.Карасев // Освоение минеральных ресурсов Севера: проблемы и решения: Тр. 9-й Междунар. науч.- практич. конф. Воркута, 2011.
  2. Кулагин Н.И. Пересадочные узлы на линиях метрополитена глубокого заложения. М., 2000.
  3. Тетиор А.Н. Проектирование и строительство подземных зданий и сооружений. / А.Н.Тетиор, В.Ф.Логинов. Минск: 1990.
  4. Demenkov P.A. Ocena stanów naprężeniowo- odkształceniowych w obudowie wielofunkcyjnego kompleksu podziemnego połączonego ze stacją metra / P.A.Demenkov, M.A.Karasev, M.Jendrys // Gornictwoigeologia. Kwartalnik. Gliwice, 2011.

Similar articles

Application of laser scanning in the analysis of geometrical parameters object surface
2012 Yu. N. Kornilov, V. V. Kulesh
Automatic interpretation technology of aerial and satellite images according to different methods of land cover for protected areas
2012 A. A. Bogolyubova
Modeling of stress-strain state of ore massive Yakovlevsky caused by mining works under the protection ceiling
2012 O. V. Trushko, A. V. Streletskii
Use of hydrogeomechanical monitoring during shielding tunnel for underground station оf Saint Petersburg subway «Admiralteiskaya»
2012 Yu. A. Norvatov, I. B. Petrova, M. V. Sergutin
Methodology of the complex estimation of influence of tectonic disturbances on stability of the rock mass at mining of rock-bump hazardous ore deposits difficult geologic structure
2012 D. V. Sidorov
Evaluation of the stability of slopes with using native and foreign software
2012 A. M. Mochalov, S. A. Ishutin, A. A. Pavlovich, R. Yu. Sapachev