Submit an Article
Become a reviewer
Vol 199
Pages:
106
Download volume:

Investigation of the parameters of stressstate nearbord arrays based sequence miningcombined with open-underground mining diamond mine

Authors:
A. G. Protosenya1
A. D. Kuranov2
A. N. Shokov3
About authors
  • 1 — National Mineral Resources University (Mining University)
  • 2 — National Mineral Resources University (Mining University)
  • 3 — National Mineral Resources University (Mining University)
Date submitted:
2011-11-17
Date accepted:
2012-01-26
Date published:
2012-05-01

Abstract

The parameters of the stress state of nearbord massif of deep  open  pit  on  the example of the field development of the V.Grib. This research was done by numerical simulation using finite elements method.

Go to volume 199

References

  1. Каплунов Д.Р. Комбинированная геотехнология / Д.Р.Каплунов, В.Н.Калмыков, М.В.Рылникова. М., 2003. 560 с.
  2. Куранов А.Д. Закономерности формирования поверхностей скольжения откосов котлованов в разных грунтах и условиях нагружения / А.Д.Куранов, П.А.Деменков // Совершенствование технологии строительства шахт и подземных сооружений: Сб. научн. трудов. Вып.17. Донецк, 2011.С.260-264.

Similar articles

Prediction of high speed railway tunnel induced settlement on the Sants – La Sagrera area (Barcelona)
2012 M. A. Karasev
Efficient application of laser scanning system
2012 E. A. Nesterenko
Determination of astronomical azimuth for mining and underground workings support
2012 I. S. Pandul
Algorithm and characterization program of downhole electrosteamgenerator for heat treatment on high viscosity oil recervoirs
2012 E .A. Zagrivnyi, V. O. Zyrin
Settlement-free technologies in the construction of the Saint Petersburg subway
2012 K. P. Bezrodnyi, A. I. Salan, V. A. Maslak, V. A. Markov, M. O. Lebedev
Look-ahead estimation of consequences mines works under high-voltage line of electric transfers and monitoring behind their condition
2012 V. N. Gusev, A. S. Mironov, V. L. Trushko, Nguen Suan Bak