Prediction of the mine working stability in the massif which are crossing zone of weakening

Authors:
M. G. Popov
About authors
  • Ph.D. assistant lecturer National Mineral Resources University (Mining University)
Date submitted:
2011-11-07
Date accepted:
2012-01-19
Date published:
2012-12-29

Abstract

The volumetric model taking into consideration the driving of the mine through zone of weakening. The results of mathematical modeling on the basis of the method of finite elements of a non-linear deformed ore body with the working out of a vaulted contour are represented. The carrying out of the working is implemented step-by-step transversely to the weakness zone.

Область исследования:
(Archived) Geotechnology for development of solid mining fields
Keywords:
modeling ore massif mine working finite elements method zone of weakenin
Funding:

None

Go to volume 199

References

  1. Popov M.G., Sinegubov V.Yu. Usage of experimental and numerical method for prediction of displacements around the development in an ore massif: News of the higher education institutions. Mining Journal. 2011. Iss.6.

Similar articles

Development of the weighted biopolimer drilling mud for workover
2012 Vladimir S. Litvinenko, N. I. Nikolaev
Study of the influence of the form of security structures erected lava following on the mechanism underlying it rocks displacement
2012 V. N. Mokrienko, S. G. Negrei, D. N. Kurdyumov
The technics of mutual influenced tunnel’s temporary support stress-strain state prediction with allowance for building technology
2012 A. G. Protosenya, N. A. Belyakov
The prediction technics of tunnel sets with complex three dimensional configuration stress state with allowance for relative influence and building sequence
2012 A. G. Protosenya, N. A. Belyakov, A. D. Kuranov
Stress and strain state of «soil – pile foundations» for varios stages of high-rise building construction
2012 D. A. Potemkin, P. A. Demenkov, V. N. Ochnev, A. D. Kuranov
Look-ahead estimation of consequences mines works under high-voltage line of electric transfers and monitoring behind their condition
2012 V. N. Gusev, A. S. Mironov, V. L. Trushko, Nguen Suan Bak