The prediction technics of tunnel sets with complex three dimensional configuration stress state with allowance for relative influence and building sequence
About authors
- 1 — Ph.D., Dr.Sci. professor National Mineral Resources University (Mining University)
- 2 — Ph.D. assistant lecturer National Mineral Resources University (Mining University)
- 3 — post-graduate student National Mineral Resources University (Mining University)
Abstract
The three dimensional stress distribution in tunnel set with allowance for relative influence and building sequence is investigated. To complete the task the finite elements analysis was used. The values of stress concentration factor and conformities of stress distribution in the «lining – mass» system are estimated. The relative influence of each tunnel in tunnel set with allowance for building sequence is identified.
Область исследования:
(Archived) Geotechnology for development of solid mining fields
Keywords:
tunnel
tunnel set
stress
displacement
concentration factor
permanent lining
chamber
drift
cross slit
References
- Bulichev N.S. Mechanics of underground constructions: Textbook. Moscow, 1994.
Similar articles
Influence of magnetic field on the speed metal corrosion tubing rheological properties and product borehole
2012 M. K. Rogachev, M. I. Kuzmin, N. K. Kondrasheva
Estimation of condition tubbing lining escalator tunnel of metro station «Admiralty» by results of lazerno-scanning survey
2012 V. K. Nosov
Perspectives of further development of technics and technology of shafts building in Russia with consideration of world technologies
2012 V. A. Kurnakov, M. S. Pleshko
On estimates of stability chambers underground dissolution in seismically active areas
2012 O. V. Kovalev, S. P. Mozer, I. Yu. Tkhorikov