Assessment of cracked area to its destruction in the production of blasting

Authors:
G. P. Paramonov1
A. V. Fedoseev2
Yu. S. Gaponov3
About authors
  • 1 — National Mineral Resources University (Mining University)
  • 2 — National Mineral Resources University (Mining University)
  • 3 — National Mineral Resources University (Mining University)
Date submitted:
2012-11-27
Date accepted:
2013-01-26
Date published:
2013-11-18

Abstract

The method of calculating the net hole charges, based on a combination of fracture zones. The mechanisms of energy transfer and change of stress, depending on the material filling the cracks in the explosive destruction of the fractured   rocks.

Go to volume 204

References

  1. Волны напряжений в обводненном трещиноватом массиве / В.А.Боровиков, И.Ф.Ванягин, М.Г.Менжулин, C.B.Цирель; Ленинградский горный институт. Л.,1989.
  2. Кутузов Б.Н. Методы ведения взрывных работ. Ч.2. Взрывные работы в горном деле и промышленности: Учебник для вузов. М., 2008.
  3. Кутузов Б.Н. Определение размеров зон деформирования трещиноватости массива взрывом заряда ВВ / Б.Н.Кутузов, В.Н.Тюпин // Горный журнал. 1983. № 4.
  4. Руппенейт К.В. Деформируемость массивов трещиноватых горных пород. М., 1975.
  5. Ханукаев А.Н. Физические процессы при отбойке пород взрывом. М., 1974.
  6. Якобашвили О.П. Сейсмические методы оценки состояния массива горных пород на карьерах. М., 1992.

Similar articles

Recommendations on the content and periodicity of geodetic control of the crane tracks electric bridge crane
2013 V. G. Potyukhlyaev, G. I. Khudyakov
Algorithm to compute a flat rectangular coordinate, connectig of meridians and scale Gauss in 6-degree zone for geodetic coordinates
2013 V. N. Balandin, I. V. Menshikov, M. Ya. Bryn, Yu. G. Firsov, S. L. Shtern
Cadastral valuation methods of specially protected natural areas based conservation value of forest ecosystems
2013 M. V. Neshataev
Geomechanical analysis of surface settlement trough development due to construction of deep underground pillar station
2013 P. A. Demenkov
Assessment of stress-strain conditions around single development with nonlinear rock-mass deformation
2013 A. G. Protosenya, V. I. Semenov
High technology of underground construction in mega-cities with dense urban
2013 M. G. Popov