Application of automated software system «PRESS 3D URAL» for predicting bump hazard zones parameters and discharge borehole well in advance of the ore deposit and pillars in difficult geomechanical conditions
Authors:
About authors
- Ph.D. associate professor National Mineral Resources University (Mining University)
Abstract
Examined the scientific and methodological provisions for the safe application of room-and-pillar system in complex geotechnical and geodynamic conditions due to advance the well processing zones bump hazard, the identification of which is achieved on the basis of long-term forecasting of the state of stress and bump hazard using automated software system «PRESS 3D URAL».
Область исследования:
(Archived) Mining geomechanics
Funding:
None
References
- Instructions for safe mining operations on ores and nonmetallic deposits of underground construction sites prone and dangerous impacts on the mountain. RD 06-329-99 / SE STCSafety GGTN industry in Russia. Moscow, 2000.
- Guidelines for the use of software for the calculationand graphical construction of the stresses in the rock massaround openings / VNIMI. Leningrad, 1981.
Similar articles
Development of land relations in the Vyborg district, Leningrad region in 1944-2012 years
2013 P. S. Tukalenko, V. F. Kovyazin
Analysis of dissemination of surface deformation at open pit mining
2013 V. V. Budilova, A. A. Pavlovich, D. A. Ikonnikov
Ultrasonic study of creep in polycrystalline rocks
2013 V. M. Tsaplev, R. M. Ivanyuk, V. V. Zverevich
Geodesic support of construction of cable-stayed bridges in the city Vladivostok
2013 E. S. Bogomolova, M. Ya. Bryn, V. N. Ivanov, D. V. Krashenitsin, A. A. Nikitchin, O. P. Sergeyev, E. G. Tolstov