Metrological control administered surveying work
Authors:
About authors
- Ph.D. associate professor National Mineral Resources University (Mining University)
Abstract
Surveying work is not subject to the Law «On ensuring the uniformity of measurements in the Russian Federation» in terms of required calibration of measuring instruments. It is necessary to practice in the state surveyors guide of the Law on the application of calibration, as a means of metrological support surveying works.
Область исследования:
(Archived) Mine survey
References
- Aleksenko A.G. Metrological maintenance surveyor of the works // Surveying and geodetic the management, protection of natural resources and the construction of structures: Interuniversity collection of scientific works. Novocherkassk:Pub. house of the Yuzh.-Ros. State. tehn. University. 2012. P.71-77.
- Golovanov V.A. The problems of metrology in surveying mines // Status and prospects of Surveying: International scientific-practical conference. Yekaterinburg: Pub. house of the Ural State Mining University, 2011. P.26-29.
- Law of the Russian Federation «On Uniformity of Measurements» on April 27, 1993 4871-I // Gazette of the Congress of People's Deputies of the Russian Federation and the Supreme Soviet of the Russian Federation. 1993. N 23. Art.811.
- Instructions for mine surveys / Ministry of Coal Industry of the USSR, Institute of Mining Geomechanics and Mine Surveying. Moscow: Nedra, 1987. 240 p.
- Instructions for mine surveys (RD 07-603-03). Saint Petersburg: Pub. house of the Centre for Occupational health, safety, social partnership and professional education (TSOTPBSP), 2003. 112 p.
- The position on the licensing of mine surveys, approveding RF Government Decree of 28 March 2012 No 257 // Collection of the legislation of the Russian Federation. 2012. N 15. Art.1782.
- The collection of instructions for the production of calibration of geodetic control instruments. Moscow: Nedra, 1988. 77 p.
- Federal Law of the Russian Federation «On uniformity of measurements» on June 26, 2008. N 102-FZ. Rossiyskaya Gazeta – Federal issue N 4697. Published: July 2, 2008.
Similar articles
Modeling of work of elements of the combined box-shaped and pile base in weak soil
2013 D. A. Potyomkin, P. A. Demenkov
Modelling stressedly-deformed condition of the soil massif including elements of the multipurpose facility with multystoried underground part
2013 P. A. Demenkov, D. A. Potyomkin
Automation of architecture and urban-planning authority as the basis of strategic planning
2013 P. P. Spirin, E. B. Bejaeva, V. F. Kovyazin, E. D. Asetskaya
Geomechanical analysis of surface settlement trough development due to construction of deep underground pillar station
2013 P. A. Demenkov