Submit an Article
Become a reviewer
Vol 204
Pages:
276-283
Download volume:
RUS
Article

Development of geomechanical provision room-and-pillar system of rock burst ore deposits at great depths

Authors:
D. V. Sidorov
About authors
  • Ph.D. associate professor National Mineral Resources University (Mining University)
Date submitted:
2012-11-27
Date accepted:
2013-01-03
Date published:
2013-11-18

Abstract

Considered directions of geomechanical provide room-and-pillar system rock burst ore deposits at great depths, consisting in the modernization and development of the scientific basis of the complex methods for determining the allowable size of worked-out areas, the size of the roof chamber, the size a protective of the pillars, the size of the chamber – pillars, including with regard to their dynamic burst, and creating automated software system for long-term forecasting of the geodynamic state of the ore deposit and shockproof advance planning of activities to improve the safety of mining operations.

Область исследования:
(Archived) Mining geomechanics
Keywords:
geomechanical provision room and pillar system rock burst ore deposit
Funding:

None

Go to volume 204

Similar articles

Assessment of cracked area to its destruction in the production of blasting
2013 G. P. Paramonov, A. V. Fedoseev, Yu. S. Gaponov
Possibility of using spline surfaces for surface plotting by results of surveying
2013 E. A. Nesterenko
Determining of the parameters of water conducting fracture zone through values of underminen strata horizontal deformations values
2013 V. N. Gusev, D. A. Ilukhin, A. G. Aleksenko
Assessment of stress-strain conditions around single development with nonlinear rock-mass deformation
2013 A. G. Protosenya, V. I. Semyonov
Experience evaluation of land in germany
2013 E. N. Bykova
Especially land managment and development trends of campuses
2013 O. A. Pasko