Submit an Article
Become a reviewer
Vol 204
Pages:
134-137
Download volume:
RUS
Article

Optional distances between cylinder reflectors and laser scanning system

Authors:
M. G. Vystrchil
About authors
  • post-graduate student National Mineral Resources University (Mining University)
Date submitted:
2012-11-06
Date accepted:
2013-01-07
Date published:
2013-11-18

Abstract

The optimization of the survey work quarries and heap of terrestrial laser scanner is taken to account. Optimization is based on the analysis of correlation between time spent on scanning, reflectors decoding quality, scans registration accuracy for different distances between the laser scanning system and reflector.

Область исследования:
(Archived) Mine survey
Keywords:
laser scanning reflectors scan registration
Funding:

None

Go to volume 204

References

  1. Gusev V.N., Volohov E.M., Golovanov V.A., Ivanov I.P., Vasil`ev M.U., Nosov V.K., Yushmanov P.I. Methods of an estimation of the hydraulic engineering tunnels according to the laser scanning survey // Proceedings of the Mining Institute. 2011. Vol.190. P.267-273.
  2. Seredovich V.A., Komissarov A.V., Komissarov D.V., Shirokova T.A. Laser scanning surveys. Novosibirsk: Pub. house of SGGA. 2009. 261 p.
  3. Nesterenko E.A. Methods of survey of pits, dumps and waterhouses based on the use of 3D laser scanners: Research Paper ... PhD in eng. sc. / Saint Petersburg Mining Institute. Saint Petersburg, 2010. 20 p

Similar articles

Formation of technical areas rock burst in the coal seam
2013 M. G. Mustafin
Application of automated software system «PRESS 3D URAL» for predicting bump hazard zones parameters and discharge borehole well in advance of the ore deposit and pillars in difficult geomechanical conditions
2013 D. V. Sidorov
Recommendations on the content and periodicity of geodetic control of the crane tracks electric bridge crane
2013 V. G. Potjuchliaev, G. I. Khudiakov
Development of geomechanical provision room-and-pillar system of rock burst ore deposits at great depths
2013 D. V. Sidorov
Characteristics of the strain-stress distribution of the quarry face with different curve
2013 M. G. Mustafin, A. V. Panchenko
Automation of architecture and urban-planning authority as the basis of strategic planning
2013 P. P. Spirin, E. B. Bejaeva, V. F. Kovyazin, E. D. Asetskaya