Submit an Article
Become a reviewer
Vol 204
Pages:
82-90
Download volume:
RUS
Article

Influence condition of ground on complexity in the process open pit Kuzbas`s coal deposits

Authors:
R. A. Takranov1
A. A. Litvinova2
About authors
  • 1 — Ph.D., Dr.Sci. professor National Mineral Resources University (Mining University)
  • 2 — student National Mineral Resources University (Mining University)
Date submitted:
2012-11-26
Date accepted:
2013-01-19
Date published:
2013-11-18

Abstract

The complexity condition of ground in the process of open mining coal are determined inclination of seam, seam height, seam depth. It was confirmed by operations analysis recoverability benk. The dependence index of labour requirement and cost of mining operations on written factors was indentified. Magnitude of factors and gegree impact on technical and economic performance coal opencasts of Kuzbass.

Область исследования:
(Archived) Mine survey
Keywords:
operations analysis mining-and-geological complexity mathematical justification
Go to volume 204

References

  1. Takranov R.A., Zhilin V.P. Basis of typification mining-and-geological complexity open mining coal in Kuzbas // Reporter Kuzbas State Technikon. 2002. N 4. P.11-17.

Similar articles

Possibility of using spline surfaces for surface plotting by results of surveying
2013 E. A. Nesterenko
Lev Kelly: the 100th anniversary
2013 S. I. Pandul
Application of automated software system «PRESS 3D URAL» for predicting bump hazard zones parameters and discharge borehole well in advance of the ore deposit and pillars in difficult geomechanical conditions
2013 D. V. Sidorov
Assessment of stress-strain conditions around single development with nonlinear rock-mass deformation
2013 A. G. Protosenya, V. I. Semyonov
Application of terrestrial laser scanning for creation of three-dimensional models of Shukhov tower
2013 V. A. Valkov, M. G. Mustafin, G. V. Makarov
Metrological control administered surveying work
2013 V. A. Golovanov