Recommendations on the content and periodicity of geodetic control of the crane tracks electric bridge crane
About authors
- 1 — Ph.D. associate professor National Mineral Resources University (Mining University)
- 2 — Ph.D., Dr.Sci. professor National Mineral Resources University (Mining University)
Abstract
Presents the results of full-scale observation of the state of rail crane tracks in the period of their operation. It is established, that at a geodetic control of a craft of the crane equipment, special attention should be paid to the bridge cranes and the status of crane rails in the plan.
Область исследования:
(Archived) Engineering geodesy
References
- A.s. 734502 USSR. (51) M. Kl.² G 01 B 11/24. Device for control of non flatness / N.A.Gusev, V.G. Potjuchliaev. From 1980. Bull. No 18.
- Donscich I.E. Rang method of measuring the displacement of structures. Moscow: Nedra, 1974. 192 p.
- Potjuchliaev V.G., Shalygin M.V. On the organization of the geodesic maintenance shop of the crane equipment // Mine surveying and geodesy / Leningrad Mining Institute. Leningrad, 1987. P.47-51.
- Rules of arrangement and safe operation of loadlifting cranes. Moscow: Metallurgy, 1973. 193 p.
- Rumshisciy L.Z. Elements of the theory of probability. Moscow: Nauka, 1976. 240 p.
- Sytnik V.S. Construction geodesy. Moscow: Nedra, 1974. 136 p.
Similar articles
Analysis of dissemination of surface deformation at open pit mining
2013 V. V. Budilova, A. A. Pavlovich, D. A. Ikonnikov
Prediction of surface settlements duo to construction of underground structures in geological condition of Saint Petersburg
2013 M. A. Karasev